Capitalising Experiential Knowledge for Guiding Construction Procurement Selection

نویسندگان

  • S. Thomas Ng
  • Martin Skitmore
چکیده

Capitalising useful knowledge for construction procurement selection (CPS) decisions would provide a valuable asset to client organisations, as the successful/unsuccessful experience would help decision-makers avoid the occurrence of similar errors and ensure the most suitable procurement system is employed for a construction project. As a result, there is a need to examine the potential for developing a knowledge management model to capture and reuse experiential knowledge to guide CPS decisions. This paper begins by identifying a suitable approach for managing CPS knowledge. This is followed by a discussion of the knowledge required for CPS decision support. A prototype knowledge-management model is developed, using the Case-Based Reasoning (CBR) approach, and a mechanism for the retrieval and reuse of knowledge for guiding CPS decisions is elucidated. The results indicate that CBR is a suitable tool for formulating the procurement selection parameters and selecting a suitable procurement system for a construction project. This is primarily because the CBR approach is flexible enough to allow closely matching historic cases to be retrieved as well as enabling the decision-maker to adapt the proposed solution based on the predominant characteristics of the client, project and external environment pertinent to the current project.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Uncommon Sense and Artificial Intelligence for Re- Engineering Procurement Systems

Common sense and occasional innovations have hitherto failed to fuel more than incremental improvements in construction procurement systems. Even the bolder initiatives have not yet unleashed promised productivity gains which have been allegedly restrained by adversarial and otherwise inappropriate procurement systems. Both (a) the present proliferation of procurement options; and (b) the scatt...

متن کامل

Innovative Construction Procurement Selection through an Artificial Intelligence Approach

The construction industry in the British Isles has long been accused of being low tech, averse to funding research and development, and reliant on other sectors allied to construction for innovative improvements. One area has been championed as reflecting change, especially post Latham and Egan, and that is construction procurement. The last few decades have witnessed a proliferation of procure...

متن کامل

A Multi-attribute Reverse Auction Framework Under Uncertainty to the Procurement of Relief Items

One of the main activities of humanitarian logistics is to provide relief items for survivors in case of a disaster. To facilitate the procurement operation, this paper proposes a bidding framework for supplier selection and optimal allocation of relief items. The proposed auction process is divided into the announcement construction, bid construction and bid evaluation phases. In the announcem...

متن کامل

Knowledge Management Challenges within Traditional Procurement System

In the construction industry, project members are conveyor of project knowledge which is, often, not managed properly to be used in future projects. As construction projects are temporary and unique, project members are willing to be recruited once a project is completed. Therefore, poor management of knowledge across construction projects will lead to a considerable amount of knowledge loss; t...

متن کامل

Journal of Public Procurement, Volume 9, Issue 2, 248-261 Summer 2009 a Decision Analysis Framework for Vendor Selection in Construction Projects in Greece

The aim of the present paper is to model the vendor selection process in construction projects in Greece. The applied approach involves a multicriteria rating technique used for calculating a normalized economic bid for the alternatives (i.e. vendors) by determining a proposed multiplier coefficient. This technique uses two stage compromise programming procurement criteria and weights according...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2005