A Unified Model for Probabilistic Principal Surfaces
نویسندگان
چکیده
Principal curves and surfaces are nonlinear generalizations of principal components and subspaces, respectively. They can provide insightful summary of high-dimensional data not typically attainable by classical linear methods. Solutions to several problems, such as proof of existence and convergence, faced by the original principal curve formulation have been proposed in the past few years. Nevertheless, these solutions are not generally extensible to principal surfaces, the mere computation of which presents a formidable obstacle. Consequently, relatively few studies of principal surfaces are available. We recently proposed the probabilistic principal surface (PPS) to address a number of issues associated with current principal surface algorithms. PPS uses a manifold oriented covariance noise model, based on the generative topographical mapping (GTM), which can be viewed as a parametric formulation of Kohonen’s self-organizing map. Building on the PPS, we introduce a unified covariance model that implements PPS (0 < α < 1), GTM (α = 1), and the manifold-aligned GTM (α > 1) by varying the clamping parameter α. We then comprehensively evaluate the empirical performance (reconstruction error) of PPS, GTM, and the manifold-aligned GTM on three popular benchmark datasets. It is shown in two different comparisons that the PPS outperforms the GTM under identical parameter settings. Convergence of the PPS is found to be identical to that of the GTM, and the computational overhead incurred by the PPS decreases to 40% or less for more complex manifolds. These results show that the generalized PPS provides a flexible and effective way of obtaining principal surfaces.
منابع مشابه
A UNIFIED MODEL FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM WITH UNCERTAIN ACTIVITY DURATIONS
In this paper we present a unified (probabilistic/possibilistic) model for resource-constrained project scheduling problem (RCPSP) with uncertain activity durations and a concept of a heuristic approach connected to the theoretical model. It is shown that the uncertainty management can be built into any heuristic algorithm developed to solve RCPSP with deterministic activity durations. The esse...
متن کاملOptimal Locating and Sizing of Unified Power Quality Conditioner- phase Angle Control for Reactive Power Compensation in Radial Distribution Network with Wind Generation
In this article, a multi-objective planning is demonstrated for reactive power compensation in radial distribution networks with wind generation via unified power quality conditioner (UPQC). UPQC model, based on phase angle control (PAC), is used. In presented method, optimal locating of UPQC-PAC is done by simultaneous minimizing of objective functions such as: grid power loss, percentage of n...
متن کاملDevelopment of simulation model for performance evaluation of feed water system in a typical thermal power plant
The present paper deals with development of a simulation model for the performance evaluation of feed water system of a thermal power plant using Markov Birth-Death process and probabilistic approach. In present paper, the feed water system consists of four subsystems. After drawing transition diagram for feed water system, differential equations are developed and then solved recursively using ...
متن کاملمدل ترکیبی تحلیل مؤلفه اصلی احتمالاتی بانظارت در چارچوب کاهش بعد بدون اتلاف برای شناسایی چهره
In this paper, we first proposed the supervised version of probabilistic principal component analysis mixture model. Then, we consider a learning predictive model with projection penalties, as an approach for dimensionality reduction without loss of information for face recognition. In the proposed method, first a local linear underlying manifold of data samples is obtained using the supervised...
متن کاملA New Stability Approach using Probabilistic Profile along Direction of Excavation
Estimation of the possible instability that may be encountered in the excavation slope(s) during the planning and application steps of the rock excavation processes is an important issue in geoengineering. In this paper, a modelling method is presented for assessing the probability of wedge failure involving new permanent or temporary slope(s) along the planned excavation dir...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- IEEE Trans. Pattern Anal. Mach. Intell.
دوره 23 شماره
صفحات -
تاریخ انتشار 2001