Sequencing and scheduling in the sheet metal shop

نویسندگان

  • B. Verlinden
  • D. Cattrysse
  • H. Crauwels
  • J. Duflou
چکیده

1.1 History Sheet metal operations have been in existence since 8000 B.C. (Fries-Knoblach, 1999). Due to its long history, sheet metalworking is, unfortunately, often seen as archaic and uninteresting. That metal sheets can be transformed with the aid of robust machines into fancy consumer products with tight tolerances is inconceivable to many. Yet, sheet metal operations are used for producing both structural components and durable consumer goods. Nowadays, sheet metal parts are widely present in different daily life products. During the past decades, scientific research in the field of sheet metal operations has been booming and international conferences on different sheet metal topics attract numerous attendants. Both industry and the academic community recognize the importance of continuing improvement in sheet metal operations. Thirty years ago, the rapid advance of computer systems triggered the introduction of automation in manufacturing environments. Also for sheet metal operations the use of computer systems has become indispensable to survive. Computer aided design (CAD) and computer aided manufacturing (CAM) systems are widely present in sheet metal production environments. At the earliest design stage, CAD systems are used to computerize the whole process of drawing and redrawing the desired part. Most modern CAD systems allow to build up a part from several re-usable 3D components, thus automating to a large extent the time consuming design process. The use of computers has also entered the manufacturing stage through computer aided manufacturing. The CAD file is converted into a sequence of processes for manufacture on a numerically controlled (NC) machine. The use of computers helps operators in automating different steps of the production process. As far as planning is concerned, most attention is focused on the computerization of sheet metal process planning. Production planning proper received much less attention due to a long tradition of experience-based production planning.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Flexible job shop scheduling under availability constraints

In this paper, an exact geometric algorithm is presented for solving two-job sequencing and scheduling problems in flexible flow shop and job shop environments while the resources are (un)available in some time periods and processors (un)availability is the same in all work centers. This study seems utterly new and it is applicable to any performance measure based on the completion time. The in...

متن کامل

Minimizing the maximum tardiness and makespan criteria in a job shop scheduling problem with sequence dependent setup times

The job shop scheduling problem (JSP) is one of the most difficult problems in traditional scheduling because any job consists of a set operations and also any operation processes by a machine. Whereas the operation is placed in the machine, it is essential to be considering setup times that the times strongly depend on the various sequencing of jobs on the machines. This research is developed ...

متن کامل

Sheet-Metal Shop Scheduling Considering Makespan and Flow Time Criteria

Sheet-metal parts typically follow a unidirectional flow in the sheet-metal shop. In the first cutting stage, a large sheet is cut to different unfolded parts with a laser cutting machine. To avoid waste material different parts are combined on a sheet. Next, the 2D parts are transformed to 3D products with air bending. In this bending stage, timeconsuming set-ups between production layouts are...

متن کامل

An integrated approach for scheduling flexible job-shop using teaching–learning-based optimization method

In this paper, teaching–learning-based optimization (TLBO) is proposed to solve flexible job shop scheduling problem (FJSP) based on the integrated approach with an objective to minimize makespan. An FJSP is an extension of basic job-shop scheduling problem. There are two sub problems in FJSP. They are routing problem and sequencing problem. If both the sub problems are solved simultaneously, t...

متن کامل

Sequencing and Scheduling in Coil Coating with Shuttles

We consider a complex planning problem in integrated steel production. A sequence of coils of sheet metal needs to be color coated in consecutive stages. Different coil geometries and changes of coatings may necessitate time-consuming setup work. In most coating stages one can choose between two parallel color tanks in order to reduce setup times. As a complicating consequence, setup times for ...

متن کامل

Integrated Sequencing and Scheduling in Coil Coating

W consider a complex planning problem in integrated steel production. A sequence of coils of sheet metal needs to be color coated in consecutive stages. Different coil geometries and changes of colors necessitate time-consuming setup work. In most coating stages one can choose between two parallel color tanks. This can either reduce the number of setups needed or enable setups concurrent with p...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2008