Study on Application of Electromagnetic Tomography Advanced Geological Prediction in Tunnel Construction

نویسندگان

  • Jinmin Guo
  • Congshuang Luo
چکیده

With the large-scale construction and rapid development of underground engineering, a large number of underground engineering construction, such as tunnel and subway emerged. The geological structure of the tunnel is complex and the roc is fragmented. The electromagnetic tomography is a new geophysical technique in the tunnel. This method has advantages such as high resolution, high reliability and obvious image characteristics. Therefore, to insure the safety of the construction and to eliminate geological disasters, the advanced prediction technology of electromagnetic wave in tunnel detection is applied. In the paper, the electromagnetic tomography was used to detect the Huangzhuang tunnel geological condition. Electromagnetic wave can effectively and safely guide the excavation of the tunnel section working surface in combination with reconstructed images and excavation technology. The tunnel is narrow and long, the complete projection method cannot be used, so the coefficient matrix formed by the electromagnetic tomography. Exploration technology is highly sparse, and the maximum coverage of the limited angle is only 30°. So it is very difficult to get the complete reconstruction in anomaly areas under these conditions with present studies. Through numerical value analysis, its horizontal projection matrix has high reliability and guidance, at the same time, it can be safe in the tunnel.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

The Application of Tunnel Reflection Tomography in Tunnel Geological Advanced Prediction Based on Regression Analysis

In the tunnel construction, due to the limitation of the survey and design and the complex dynamics of tunnel surrounding rock geological conditions, so it is difficult for complex geology with the microscopic accurate grasp, often which caused by geological exploration data do not tally with the actual situation, often encountered in karst water inrush, large deformation in weak rock, cave-in ...

متن کامل

Tunnel design and construction process in difficult ground conditions with Analysis of Controlled Deformations (ADECO) approach; a Case Study

The 10.6 km long Sabzkuh water conveyance tunnel is currently under construction in High Zagros structural zone, located in western Iran, has used conventional (in section T1) and mechanized (in section T2) methods. The section T1 of the tunnel driven through alluvial geological units with great complexity in an area high potential for sliding and water-bearing fault which has made the excavati...

متن کامل

Geological Hazards analysis in Urban Tunneling by EPB Machine (Case study: Tehran subway line 7 tunnel)

Technological progress in tunneling has led to modern and efficient tunneling methods in vast underground spaces even under inappropriate geological conditions. Identification and access to appropriate and sufficient geological hazard data are key elements to successful construction of underground structures. Choice of the method, excavation machine, and prediction of suitable solutions to over...

متن کامل

Application of Tunnel Seismic Image Approach to the Advanced Geological Prediction for Tunnel

With the large-scale construction and rapid development of underground engineering, a large number of underground engineering construction, such as tunnel and subway emerged. The geological structure of the tunnel is complex and the roc is fragmented. Tunnel seismic image is a new geophysical technique. This method has advantages such as high resolution, high reliability and obvious image chara...

متن کامل

Tunnel surrounding rock classification forecast based on the geological advanced prediction system in seismic area

The global earthquake disaster happened frequently in recent years, how to guide the construction correctly in seismic area becoming a problem to be solved, while the study on the tunnel geological advanced prediction system in seismic area is limited. This paper established an integrated prediction system which was combined with engineering geology analysis and geophysical method combined with...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • JNW

دوره 9  شماره 

صفحات  -

تاریخ انتشار 2014