Real Time Monitoring of Long Slender Shaft by Distributed-Lumped Modeling Techniques
نویسندگان
چکیده
The aim of this paper is to determine the stress levels at the end of a long slender shaft such as a drilling assembly used in the oil or gas industry using a mathematical model in real-time. The torsional deflection experienced by this type of drilling shaft (about 4 KM length and 20 cm diameter hollow shaft with a thickness of 1 cm) can only be determined using a distributed modeling technique. The main objective of this project is to calculate angular velocity and torque at the end of the shaft by TLM method and also analyzing of the behavior of the system by transient response. The obtained result is compared with lumped modeling technique the importance of these results will be evident only after the mentioned comparison. Two systems have different transient responses and in this project because of the length of the shaft transient response is very important. Keywords—Distributed Lumped modeling, Lumped modeling, Drill string, Angular Velocity, Torque.
منابع مشابه
E ects of Rotary Inertia and Gyroscopic Momentum on the Flexural Vibration of Rotating Shafts Using Hybrid Modeling
In this paper, the e ect of shaft rotation on its natural frequency is investigated. Considering rotary inertia and gyroscopic momentum, the fourth order di erential equation representing the exural vibration of the shaft is solved by the new analytical method. The Distributed Lumped Modeling Technique (DLMT) is applied to obtain the transfer matrix for the distributed elements using the propos...
متن کاملProposed new signal for real-time stress monitoring: Combination of physiological measures
Human stress is a physiological tension that appears when a person responds to mental, emotional, or physical chal-lenges. Detecting human stress and developing methods to manage it, has become an important issue nowadays. Au-tomatic stress detection through physiological signals may be a useful method for solving this problem. In most of the earlier studies, long-term time window was considere...
متن کاملA Multiprocessor System with Non-Preemptive Earliest-Deadline-First Scheduling Policy: A Performability Study
This paper introduces an analytical method for approximating the performability of a firm realtime system modeled by a multi-server queue. The service discipline in the queue is earliestdeadline- first (EDF), which is an optimal scheduling algorithm. Real-time jobs with exponentially distributed relative deadlines arrive according to a Poisson process. All jobs have deadlines until the end of s...
متن کاملInvestigation of vortex-induced vibration phenomenon in verticallong circular slender structure with non-uniform flows
Analyzing the vortex-induced vibration of a slender marine structure withlength to diameter ratio up to 200 is the objective of this study. This slender is free to move in both in-line and cross flow directions and immersed completely in water. Three different types of shear currents pass on it and cause to vibrate slender in different forms. Nowadays, these vibrations are very important for de...
متن کاملF-STONE: A Fast Real-Time DDOS Attack Detection Method Using an Improved Historical Memory Management
Distributed Denial of Service (DDoS) is a common attack in recent years that can deplete the bandwidth of victim nodes by flooding packets. Based on the type and quantity of traffic used for the attack and the exploited vulnerability of the target, DDoS attacks are grouped into three categories as Volumetric attacks, Protocol attacks and Application attacks. The volumetric attack, which the pro...
متن کامل