Visual Management in Industrial Construction: a Case Study
نویسندگان
چکیده
Visual Management (VM) is a distinctive communication strategy that is frequently observed at lean work settings to varying degrees. It relies on the effectiveness of visual communication and catchy visual systems to create visual communication for different managerial purposes. VM in construction has generally been discussed within a building construction context to date. This paper investigates the VM realisation means (visual tools) and attributes in the construction process of a very large industrial facility, which mainly involves mechanical and electrical construction works. A VM research on the construction site of an industrial facility will help address a gap in the field and extend the understanding of the VM applications in a different construction context other than the building construction/renovation. The research question of how VM is realized in the industrial construction context was investigated through the case study research method. One of the biggest subcontractors of a very large gas-processing facility was studied in terms of their VM approach and applications. Interviews, site observation and photographic documentation are the main data collection methods. New VM application opportunities in pipe spool fabrication and crane management were identified. Some industrial construction specific visual systems, VM application attributes for industrial constructions, managerial insights and future application directions were also captured and presented.
منابع مشابه
Methodology based on MCDM for risk management in EPC projects: A Case Study of LPG Storage Tanks Construction
The most important aim of every project is on time completion, budget consideration and reaching the highest possible quality, based on contract. This paper suggests a methodology for risk management in engineering, procurement, and construction (EPC) projects. Risk management enables project teams to perform with minimum deviation from predetermined goals. The proposed methodology identifies a...
متن کاملUsing Hybrid Fuzzy PROMETHEE II and Fuzzy Binary Goal Programming for Risk Ranking: A Case Study of Highway Construction Projects
Multi attribute decision making methods are considered as one of the most useful methods for solving ranking problems. In some decision making problems, while the alternatives for corresponding criteria are compared in a pairwise comparison manner, if the criteria are inherently fuzzy, debates will arise in ranking alternatives due to the closeness of the values of the criteria. In this researc...
متن کاملErgonomics Issues in the Construction Safety: A Case Study in Iran
Objectives: Because of the high rates of accidents, the construction industry has become a hazardous industry in Iran and therefore paying more attention is required. This paper investigates safety management in construction companies for improving workers’ safety as one of the ergonomics aims. Methods: In order to survey the safety management in construction companies a questionnaire was pr...
متن کاملA new multi-objective mathematical model for hazardous waste management considering social and environmental issues
Hazardous waste management incorporates collection, separation, treatment, recycling and disposal of hazardous wastes. In this paper, a new multi-objective mixed integer model is presented for hazardous waste collection problem. The model aims to minimize transportation and construction costs, and environmental and population risks in hazardous waste management systems. This model is applied in...
متن کاملImprovement of project management office performance: An empirical investigation of effective factors in iranian construction industry
Project management office (PMO) is a new emerging concept in Iranian construction industry. Executives expect this organizational unit to add value to the business, and meet the demands of stakeholders by performing specialized tasks ranging from providing project management support to portfolio management. In this regard, PMO managers have long faced the question of how to improve the performa...
متن کامل