Schedule and Condition Responsive Maintenance Strategies for Optimum Utilization of Maintenance Budget
نویسنده
چکیده
–The maintenance of pavements and particularly for flexible pavement is an essential requirement for the efficiency of highway network. For better serviceability, flexible pavements require more maintenance as compared to maintenance required for rigid pavements. But developing counties like India does not have sufficient budget or funds to satisfy the requirements. The maintenance & rehabilitation (M&R) Strategy should be selected on the basis of optimum utilization of maintenance funds. The magnitude of the work involved in maintenance is very large as the multilane network is increasing at manifolds. The funds available are not enough to meet the requirements. As per MORT&H (Ministry of Road Transport & Highways) 2004, approximately 50% budget is generally approved in place of required budget. So, in developing countries like India, where the budget is limited, an optimum strategy should be selected on the basis of scheduled or condition responsive maintenance strategies. The objective of this paper is to analyze the data of identified flexible pavement sections to compare the schedule and condition responsive maintenance strategies. The scheduled M&R strategy has been selected as per the current maintenance norms provided by the Ministry of Road Transport & Highways in year 2001. whereas the condition responsive M&R strategy has been selected as per the serviceability levels up to which the respective pavement section is to be maintained. The study is to show the optimum utilization of maintenance funds on the basis of comparison. The effect of International Roughness Index (IRI) was taken for this comparative study. For this study a National Highway section from Ghaziabad – Hapur (NH-24) was taken.
منابع مشابه
Availability analysis of mechanical systems with condition-based maintenance using semi-Markov and evaluation of optimal condition monitoring interval
Maintenance helps to extend equipment life by improving its condition and avoiding catastrophic failures. Appropriate model or mechanism is, thus, needed to quantify system availability vis-a-vis a given maintenance strategy, which will assist in decision-making for optimal utilization of maintenance resources. This paper deals with semi-Markov process (SMP) modeling for steady state availabili...
متن کاملVALUE ENGINEERING ANALYSIS FOR THE EDUCATIONAL BUILDINGS IN EGYPT
General Authority for Educational Buildings (GAEB) in Egypt is responsible for new construction and maintenance of the educational building [1]. According to the Sixth Five- Years Plan in Egypt, the program of educational structures includes new construction of about 2915 schools, with 39.8 thousand classes. Also, maintenance works for buildings about 1250 schools. These works needs a high budg...
متن کاملStrategic Planning for the National Bridge Stock of Iran
The National Bridge Stock of Iran consists of about 330,000 bridges, of which around 50% are older than 30 years. Since 2010, Iran Road Maintenance & Transportation Organization has started implementing a comprehensive Bridge Management System in order to manage this aged stock efficiently. To predict future conditions of bridge stock, a heuristic numerical method is presented. This methodology...
متن کاملMaintenance and work-rest scheduling in Human-machine system according to fatigue and reliability
Most manufacturers use human-machine systems to produce high-quality products. Dealing with human-machine systems is very complicated since not only machines should be utilized in proper condition but also appropriate environment should be provided for human resources. Most manufacturers have a maintenance plan for machines but many of them do not have a proper work-rest schedule for human reso...
متن کاملMaintenance and Work-rest Scheduling in Human-machine System According to Fatigue and Reliability
Most manufacturers use human-machine systems to produce high-quality products. Dealing with human-machine systems is very complicated since not only machines should be utilized in proper condition but also appropriate environment should be provided for human resources. Most manufacturers have a maintenance plan for machines but many of them do not have a proper work-rest schedule for human reso...
متن کامل