Finding multiple possible critical paths using fuzzy PERT
نویسندگان
چکیده
Program evaluation and review techniques (PERT) is an efficient tool for large project management. In actual project control decisions, PERT has successfully been applied to business management, industry production, project scheduling control, logistics support, etc. However, classical PERT requires a crisp duration time representation for each activity. This requirement is often difficult for the decision-makers due to the fact that they usually can not estimate these values precisely. In recent years, some fuzzy PERT methods have been proposed based on fuzzy set theory for project management. However, there is a drawback in the existing fuzzy PERT methods, i.e., sometimes they maybe cannot find a critical path in a fuzzy project network. In this paper, we propose a fuzzy PERT algorithm to find multiple possible critical paths in a fuzzy project network, where the duration time of each activity in a fuzzy project network is represented by a fuzzy number. The proposed algorithm can overcome the drawback of the existing fuzzy PERT methods.
منابع مشابه
An Algorithm to Obtain Possibly Critical Paths in Imprecise Project Networks
We consider criticality in project networks having imprecise activity duration times. It is well known that finding all possibly critical paths of an imprecise project network is an NP-hard problem. Here, based on a method for finding critical paths of crisp networks by using only the forward recursion of critical path method, for the first time an algorithm is proposed which can find all pos...
متن کاملAnalysis of critical paths in a project network with random fuzzy activity times
Project planning is part of project management, which is relates to the use of schedules such as Gantt charts to plan and subsequently report progress within the project environment. Initially, the project scope is defined and the appropriate methods for completing the project are determined. In this paper a new approach for the critical path analyzing a project network with random fuzzy activi...
متن کاملA New Approach to Approximate Completion Time Distribution Function of Stochastic Pert Networks
The classical PERT approach uses the path with the largest expected duration as the critical path to estimate the probability of completing a network by a given deadline. However, in general, such a path is not the most critical path (MCP) and does not have the smallest estimate for the probability of completion time. The main idea of this paper is derived from the domination structure between ...
متن کاملA study of cash flows in projects with fuzzy activity durations
In order to deal with imprecision inherent in the planning and scheduling of projects, various extensions of CPM (Critical Path Method) and PERT (Program Evaluation and Review Technique) have been proposed in the literature. The main aim of these studies has mainly been the application of Fuzzy Set Theory in the computation of activity start and completion dates, and consequently in the calcula...
متن کاملOn the Latest Times and Float Times of Activities in a Fuzzy Project Network with LR Fuzzy Numbers
In this paper, the authors propose a new method to compute the fuzzy latest times and float times of activities for a project scheduling problem with fuzzy activity times. The authors have considered LR fuzzy numbers to represent the activity times. As the data of the problem are LR fuzzy numbers, the authors have shown that the results are also in terms of LR fuzzy numbers. Total float time of...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- IEEE transactions on systems, man, and cybernetics. Part B, Cybernetics : a publication of the IEEE Systems, Man, and Cybernetics Society
دوره 31 6 شماره
صفحات -
تاریخ انتشار 2001