Boiler tube corrosion characterization with a scanning thermal line
نویسندگان
چکیده
Wall thinning due to corrosion in utility boiler waterwall tubing is a significant operational concern for boiler operators. Historically, conventional ultrasonics has been used for inspection of these tubes. Unfortunately, ultrasonic inspection is very manpower intense and slow. Therefore, thickness measurements are typically taken over a relatively small percentage of the total boiler wall and statistical analysis is used to determine the overall condition of the boiler tubing. Other inspection techniques, such as electromagnetic acoustic transducer (EMAT), have recently been evaluated, however they provide only a qualitative evaluation identifying areas or spots where corrosion has significantly reduced the wall thickness. NASA Langley Research Center, in cooperation with ThermTech Services, has developed a thermal NDE technique designed to quantitatively measure the wall thickness and thus determine the amount of material thinning present in steel boiler tubing. The technique involves the movement of a thermal line source across the outer surface of the tubing followed by an infrared imager at a fixed distance behind the line source. Quantitative images of the material loss due to corrosion are reconstructed from measurements of the induced surface temperature variations. This paper will present a discussion of the development of the thermal imaging system as well as the techniques used to reconstruct images of flaws. The application of the thermal line source coupled with the analysis technique represents a significant improvement in the inspection speed and accuracy for large structures such as boiler waterwalls. A theoretical basis for the technique will be presented to establish the quantitative nature of the technique. Further, a dynamic calibration system will be presented for the technique that allows the extraction of thickness information from the temperature data. Additionally, the results of the application of this technology to actual waterwall tubing samples and insitu inspections will be presented.
منابع مشابه
Effect of Corrosion on Heat Transfer through Boiler Tube and Estimating Overheating
The product of corrosion in the feed water system transported into the boiler and gets deposited on the internal surface of waterwall tubes. Proper treatment of boiler feedwater effectively protects against corrosion of feedwater heaters, economizers, and deaerators. It leads to overheating and on-load corrosion and ultimately tube failure.. Heat is transferred through a thin layer of superheat...
متن کاملEMAT Integrated with Vertical Climbing Robot for Boiler Tube Inspection
National Thermal Power Corporation (NTPC) has signed an MoU with Bhabha Atomic Research Centre (BARC) for design and development of automated boiler tube inspection system for vertical water wall tubes. A vertical climbing robot has been developed for this purpose at Division of Remote Handling & Robotics (DRHR), BARC. Recently, an Electromagnetic Acoustic Transducer (EMAT) has been integrated ...
متن کاملDesign of Boiler Welding for Improvement of Lifetime and Cost Control
Fe-2.25Cr-1Mo a widely used material for headers and steam tubes of boilers. Welding of steam tube to header is required for production of boiler. Heat affected zone of the weld can have poor mechanical properties and poor corrosion behavior leading to weld failure. The cost of material used for steam tube and header of boiler should be controlled. This study propose a new materials design for ...
متن کاملDeveloping of Corrosion Resistance Nano Copper Oxide Coating on Copper using Anodization in Oxalate solution
Copper alloys are widely used in the manufacturing of heat transfer applications, this due to their excellent heat transfer properties. Copper contamination is one of the serious industrial problems in the boiler feed water system. This contamination commonly resulted from copper corrosion reactions in boiler feed water environment. The best way to reduce the copper contamination is by improvin...
متن کاملHandling and Co-firing of Shredded Municipal Refuse and Coal in a Spreader-stoker Boiler*
A system for handling up to 120 tons/day of municipal refuse has been developed for co-firing with coal in a spreader-stoker boiler at the Colum bus, Ohio, Municipal Electric Plant. This system is unique in that the refuse has undergone only shred ding to 90 percent minus 4 in. (10 cm) and magnetic separation of ferrous material. The refuse-handling system comprises: (1) a push-pit with a hyd...
متن کامل