Optimal job insertion in the no-wait job shop
نویسندگان
چکیده
The No-Wait Job Shop (NWJS) considered here is a version of the job shop scheduling problem where, for any two operations of a job, a fixed time lag between their starting times is given. Also, sequence-dependent set-up times between consecutive operations on a machine can be present. The NWJS problem consists in finding a schedule that minimizes the makespan. We address here the so-called Optimal Job Insertion problem (OJI) in the NWJS. While the OJI is NP-hard in the classical job shop, it was shown by Gröflin &Klinkert to be solvable in polynomial time in the NWJS. We present a highly efficient algorithm with running time O(n2 ·max{n,m}) for this problem. The algorithm is based on a compact formulation of the NWJS problem and a characterization of all feasible insertions as the stable sets (of prescribed cardinality) in a derived comparability graph. As an application of our algorithm, we propose a heuristic for the NWJS problem based on optimal job insertion and present numerical results that compare favorably with current benchmarks.
منابع مشابه
The no-wait job shop with regular objective: a method based on optimal job insertion
The no-wait job shop problem (NWJS-R) considered here is a version of the job shop scheduling problem where, for any two operations of a job, a fixed time lag between their starting times is prescribed. Also, sequencedependent set-up times between consecutive operations on a machine can be present. The problem consists in finding a schedule that minimizes a general regular objective function. W...
متن کاملSolving Re-entrant No-wait Flow Shop Scheduling Problem
In this study, we consider the production environment of no-wait reentrant flow shop with the objective of minimizing makespan of the jobs. In a reentrant flow shop, at least one job should visit at least one of the machines more than once. In a no-wait flowshop scheduling problem, when the process of a specific job begins on the first machine, it should constantly be processed without waiting ...
متن کاملTwo Machine Flow Shop Scheduling Problem with No Wait in Process: Controllable Machine Speeds
The paper considers a two machine flow shop scheduling problem with no wait in process. The objective is to find the optimal values of machine speeds and to determine the time-optimal schedule. There are two machines, A and B, and a set of n jobs each consisting of two operations. The first operation of each job is to be processed on machine A and the second on machine B. For each feasible sche...
متن کاملMixed Integer Linear Programs for Blocking and No Wait Job Shop Scheduling Problems in Robotic cells
This paper studies the problem of scheduling Job shops in robotic cells with no intermediate buffers, called No Wait Blocking Transport Job Shop Scheduling Problem (NWBT JSSP). This problem is an extension of the classical job shop problem. No Wait Blocking Transport job shop problems arise in many realistic production environments. To tackle this problem, we developed a Mixed Integer Linear Pr...
متن کاملMixed Integer Linear Programs for Blocking and No Wait Job Shop Scheduling Problems in Robotic cells
This paper studies the problem of scheduling Job shops in robotic cells with no intermediate buffers, called No Wait Blocking Transport Job Shop Scheduling Problem (NWBT JSSP). This problem is an extension of the classical job shop problem. No Wait Blocking Transport job shop problems arise in many realistic production environments. To tackle this problem, we developed a Mixed Integer Linear Pr...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- J. Comb. Optim.
دوره 26 شماره
صفحات -
تاریخ انتشار 2013