Atlas DAQ Report on the Phase 1 Integration

نویسنده

  • H. Zobernig
چکیده

This note reports on the Phase 1 Integration week, carried out from Jan 22nd to Jan 26th 2001. It summarizes the steps taken to achieve a fully integrated TDAQ system as well as the difficulties met and the open issues which will have to be addressed in future. NoteNumber : 162 Version : 1.0 Date : 15.3.2001 Reference :

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

The Data-flow System of the ATLAS DAQ and Event Filter Prototype "-1" Project

A prototyping project has been undertaken by the ATLAS DAQ and Event Filter group to design and implement a fully functional vertical slice of the ATLAS DAQ and Event Filter. It supports the evaluation of hardware and software technologies as well as their system integration aspects. This paper describes the Data-flow component, its design, implementation and performanc

متن کامل

Configuration Databases in the ATLAS DAQ Prototype

A prototype of the ATLAS Prototype-1 DAQ Configuration Databases, based on persistent object managers, has been developed. We give here some details of the architecture, implementation and test results. Conclusions and plans for the further work are presented.

متن کامل

Commissioning of the ATLAS Pixel Detector

The ATLAS Pixel Detector is the innermost detector of the ATLAS experiment at LHC. Approximately 80 million silicon sensors allow to detect particle tracks and secondary vertices with very high precision. The ATLAS Pixel Detector is now in its final commissioning phase. A full characterization and qualification of the detector is currently performed: calibration procedures, special DAQ runs for...

متن کامل

Communication between Trigger/DAQ and DCS in ATLAS

Within the ATLAS experiment Trigger/DAQ and DCS are both logically and physically separated. Nevertheless there is a need to communicate. The initial problem definition and analysis suggested three subsystems the Trigger/DAQ DCS Communication (DDC) project should support the ability to: 1. exchange data between Trigger/DAQ and DCS; 2. send alarm messages from DCS to Trigger/DAQ; 3. issue comman...

متن کامل

Prototype Readout Module for the ATLAS Level-1 Calorimeter Trigger Processors

The level-1 calorimeter trigger consists of three subsystems, namely the Preprocessor, electron/photon and tau/hadron Cluster Processor (CP), and Jet/Energy-sum Processor (JEP). The CP and JEP will receive digitised calorimeter trigger-tower data from the Preprocessor and will provide trigger multiplicity information to the Central Trigger Processor and region-of-interest (RoI) information for ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2001