Solving Project Scheduling Problems by Minimum Cut Computations

نویسندگان

  • Rolf H. Möhring
  • Marc Uetz
چکیده

Rolf H. Möhring • Andreas S. Schulz • Frederik Stork • Marc Uetz Fakultät II, Institut für Mathematik, Technische Universität Berlin, Sekr. MA 6-1, Straße des 17. Juni 136, D-10623 Berlin, Germany Sloan School of Management, E53-361, Massachusetts Institute of Technology, 77 Massachusetts Avenue, Cambridge, Massachusetts 02139 ILOG Deutschland GmbH, Ober-Eschbacher Straße 109, D-61352 Bad Homburg, Germany Faculty of Economics and Business Administration, Quantitative Economics, Universiteit Maastricht, P.O. Box 616, 6200 MD Maastricht, The Netherlands [email protected][email protected][email protected][email protected]

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Solving Project Scheduling Problems by Minimum Cut Computations Solving Project Scheduling Problems by Minimum Cut Computations †

In project scheduling, a set of precedence-constrained jobs has to be scheduled so as to minimize a given objective. In resource-constrained project scheduling, the jobs additionally compete for scarce resources. Due to its universality, the latter problem has a variety of applications in manufacturing, production planning, project management, and elsewhere. It is one of the most intractable pr...

متن کامل

Resource-Constrained Project Scheduling: Computing Lower Bounds by Solving Minimum Cut Problems

We propose a novel approach to compute bounds on the objective function value of a wide class of resource-constrained project scheduling problems. The basis is a polynomial-time algorithm to solve the following scheduling problem: Given a set of activities with start-time dependent costs and temporal constraints in the form of time windows, find a feasible schedule of minimum total cost. Motiva...

متن کامل

Modeling and solving multi-skilled resource-constrained project scheduling problem with calendars in fuzzy condition

In this study, we aim to present a new model for the resource-constrained project scheduling problem (RCPSP) considering a working calendar for project members and determined the skill factor of any member using the efficiency concept. For this purpose, the recyclable resources are staff resources where any person with multiple skills can meet the required skills of activities in a given time. ...

متن کامل

On the Problem of Scheduling Parallel Computations of Multibody Dynamic Analysis

A formulation of a graph problem for scheduling parallel computations of multibody dynamic analysis is presented. The complexity of scheduling parallel computations for a multibody dynamic analysis is studied. The problem of finding a shortest critical branch spanning tree is described and transformed to a minimum radius spanning tree, which is solved by an algorithm of polynomial complexity. T...

متن کامل

Solving the Paradox of Multiple IRR\'s in Engineering Economic Problems by Choosing an Optimal -cut

Until now single values of IRR are traditionally used to estimate the time value of cash flows. Since uncertainty exists in estimating cost data, the resulting decision may not be reliable. The most commonly cited drawbacks to using the internal rate of return in evaluatton of deterministic cash flow streams is the possibility of multiple conflicting internal rates of return. In this paper we p...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2000