Factors Influencing Project Delay: A Case Study of the Vale Malaysia Minerals Project (VMMP)

نویسنده

  • A. Lee
چکیده

Delays are one of the biggest problems faced by the construction industry. Delays in construction projects have significant financial and social impact to parties involved in the projects. The main objective of this study is to explore the causes of delay in the Vale Malaysia Minerals Project (VMMP) in Lumut, Perak. This study was conducted by using a qualitative approach. A series of face to face interviews were conducted with an expert from the construction organization and VMMP staff. Responses were analysed qualitatively using content analysis. The results revealed that several factors contribute to the delay in VMMP completion, i.e. poor communication, delays in material delivery, and poor management on site, etc. Time and cost overrun were the effect of delays in the construction project. The findings of this study will help project managers and/ or the client to take necessary actions and to use of supply chain management techniques to avoid further delays in future project completion on construction projects. Keywords— Delays, construction, Vale Malaysia Mineral Project, supply chain management, Case Study

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Quantitative risk management in gas injection project: a case study from Oman oil and gas industry

The purpose of this research was to study the recognition, application and quantification of the risks associated in managing projects. In this research, the management of risks in an oil and gas project is studied and implemented within a case company in Oman. In this study, at first, the qualitative data related to risks in the project were identified through field visits and extensive interv...

متن کامل

Simulation of tunnel boring machine utilization: A case study

Utilization is one of the main managerial factors that is applied for construction process analysis well. It directly affects the project duration and construction costs. Therefore, a utilization study in tunneling projects is essential. In this work, the utilization of an earth pressure balance Tunnel Boring Machine (TBM) in Tabriz urban railway project was studied using the Monte Carlo simula...

متن کامل

Developing an Integrated Simulation Model of Bayesian-networks to Estimate the Completion Cost of a Project under Risk: Case Study on Phase 13 of South Pars Gas Field Development Projects

Objective: The aim of this paper is to propose a new approach to assess the aggregated impact of risks on the completion cost of a construction project. Such an aggregated impact includes the main impacts of risks as well as the impacts of interactions caused by dependencies among them. Methods: In this study, Monte Carlo simulation and Bayesian Networks methods are combined to present a frame...

متن کامل

Development of a forward chain approach for calculating self-delay of project activities

In the field of management, the delay within projects is a prominent and contentious issue. Due to the fact that delay leads to cost and time over-runs, it is often the subject of litigation claims and creation of managerial tensions. In a bid to bring such delays under control and also to diminish managerial tensions, it is necessary to recognize and understand the following four concepts:"typ...

متن کامل

Identify key factors influencing community-based crisis management to reduce vulnerability due to the outbreak of Coronavirus; case Study: Implementation of Shahid Soleimani project in Joybar Sirajmahale village

Background and objectiv:  With the increase in population around the world and the overuse of environmental capacities, natural disasters have increased in recent years, and every year a large number of people pay exorbitant costs (human, financial) due to natural and unnatural crises. Community -based crisis management as a new approach to improve management in advance, during and after the cr...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2017