Performance Metrics Based on Computational Action
نویسنده
چکیده
We propose a new performance metric based on computational action. We examine work as it evolves in time and compute computational action as the integral of the work function over time. We compare the action generated at less than full power with the action that could have been generated at full power. We claim that the goal of performance optimization is to minimize lost, or wasted, action. We calculate our metric for some computers in the Top500 list (http://www.top500.org) and propose a new ranking based on least action wasted. When work is a function of the resources applied, we use the classical techniques of the calculus of variations to minimize wasted action. From the result of this exercise, we calculate productivity as the ratio of work produced to resources used.
منابع مشابه
Sustainable Supplier Selection by a New Hybrid Support Vector-model based on the Cuckoo Optimization Algorithm
For assessing and selecting sustainable suppliers, this study considers a triple-bottom-line approach, including profit, people and planet, and regards business operations, environmental effects along with social responsibilities of the suppliers. Diverse metrics are acquainted with measure execution in these three issues. This study builds up a new hybrid intelligent model, namely COA-LS-SVM, ...
متن کاملMOEICA: Enhanced multi-objective optimization based on imperialist competitive algorithm
In this paper, a multi-objective enhanced imperialist competitive algorithm (MOEICA) is presented. The main structures of the original ICA are employed while some novel approaches are also developed. Other than the non-dominated sorting and crowding distance methods which are used as the main tools for comparing and ranking solutions, an auxiliary comparison approach called fuzzy possession is ...
متن کاملGoal Programming Optimization Model for Performance Management: A SCOR-Based Supply Chain Decision Alignment
This article develops an integrated model of transmitting strategies and operational activities to enhance the efficiency of supply chain management. As the second objective, this paper aims to improve supply chain performance management (SCPM) by employing proper decision-making approaches. The proposed model optimizes the performance indicator based on SCOR metrics. A process-based method is ...
متن کاملInvestigating the Impact of Organizational Learning and Marketing Metrics on the Performance of Marketing (Case Study: Elon Plast Company)
The aim of this study was to analyze the impact of organizational learning and marketing metrics on the marketing performance in the Elon Plast Company of Kermanshah province. It is a functional purpose study with descriptive – survey method. The statistical population includes 100 employees of Elon Plast Company in Kermanshah province. A sample of 80 people was chosen using Cochran formula. Da...
متن کاملBuilding a Comprehensive Conceptual Framework for Power Systems Resilience Metrics
Recently, the frequency and severity of natural and man-made disasters (extreme events), which have a high-impact low-frequency (HILF) property, are increased. These disasters can lead to extensive outages, damages, and costs in electric power systems. A power system must be built with “resilience” against disasters, which means its ability to withstand disasters efficiently while ensuring the ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- IJHPCA
دوره 18 شماره
صفحات -
تاریخ انتشار 2004