The Networked Resource Discovery Project

نویسنده

  • Michael F. Schwartz
چکیده

Large scale computer networks provide access to a bewilderingly large number and variety of resources, including retail products, network services, and people in various capacities. We consider the problem of allowing users to discover the existence of such resources in an administratively decentralized environment. We describe an approach for a system that accesses the distributed collection of repositories that naturally maintain resource information, rather than building a global database to register all resources. A key problem is organizing the resource space in a manner suitable to all participants. Rather than imposing an inflexible hierarchical organization, our approach allows the resource space organization to evolve in accordance with what resources exist and what types of queries users make. Concretely, a set of agents organize and search the resource space by constructing links between the repositories of resource information based on keywords that describe the contents of each repository, and the semantics of the resources being sought. The links form a general graph, with a flexible set of hierarchies embedded within the graph to provide some measure of scalability. The graph structure evolves over time through the use of cache aging protocols. Additional scalability is targeted through the use of probabilistic graph protocols. A prototype implementation and a measurement study are under way. hhhhhhhhhhhhhhhhhh 1 This material is based upon work supported in part by the National Science Foundation under Cooperative Agreement DCR-84200944, and by a grant from AT&T Bell Laboratories.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Automatic Discovery of Technology Networks for Industrial-Scale R&D IT Projects via Data Mining

Industrial-Scale R&D IT Projects depend on many sub-technologies which need to be understood and have their risks analysed before the project can begin for their success. When planning such an industrial-scale project, the list of technologies and the associations of these technologies with each other is often complex and form a network. Discovery of this network of technologies is time consumi...

متن کامل

Weighted-HR: An Improved Hierarchical Grid Resource Discovery

Grid computing environments include heterogeneous resources shared by a large number of computers to handle the data and process intensive applications. In these environments, the required resources must be accessible for Grid applications on demand, which makes the resource discovery as a critical service. In recent years, various techniques are proposed to index and discover the Grid resource...

متن کامل

Clumps and collection description in the information environment in the UK with particular reference to Scotland

The role, potential and interaction of networked catalogues and collection-level description have recently been given emphasis in order that efficient resource discovery mechanisms, and the effective organisation of such resources, be facilitated within the UK's developing JISC information environment (IE). This article describes the work of CC-interop, a JISC project, and related projects that...

متن کامل

Uncertain Resource Availabilities: Proactive and Reactive Procedures for Preemptive Resource Constrained project Scheduling Problem

Project scheduling is the part of project management that deals with determining when intime to start (and finish) which activities and with the allocation of scarce resources to theproject activities. In practice, virtually all project managers are confronted with resourcescarceness. In such cases, the Resource-Constrained Project Scheduling Problem (RCPSP)arises. This optimization problem has...

متن کامل

Project resource investment problem under progress payment model

As a general branch of project scheduling problems, resource investment problem (RIP) considers resource availabilities as decision variables to determine a level of employed resources minimizing the costs of the project. In addition to costs (cash outflows), researchers in the later extensions of the RIP took payments (cash inflows) received from clients into account and used the net present v...

متن کامل

A multi-objective resource-constrained project scheduling problem with time lags and fuzzy activity durations

The resource-constrained project scheduling problem is to find a schedule that minimizes the project duration subject to precedence relations and resource constraints. To further account for economic aspects of the project, one may add an objective of cash nature to the problem. In addition, dynamic nature and variations in real world are known to introduce uncertainties into data. Therefore, t...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 1989