Effect of project characteristics on project performance in construction projects based on structural equation model

نویسندگان

  • KyuMan Cho
  • TaeHoon Hong
  • ChangTaek Hyun
چکیده

Most past studies that analyze project performance and the characteristics that affect such performance consist of a simple form, in which they present the brief relationship between project performance and a few characteristics that affect it. Furthermore, due to the limitations of the research methodologies used in these studies, important characteristics were often not considered in developing the relationship between project performance and project characteristics. This study aims to analyze the overall relationship between project performance and a project’s characteristics. This study deduced (i) the overall causal relationship and (ii) the degree of influence between 17 project characteristics and five project performance indices. In order to achieve this goal, this study employed the factor analysis method and a structural equation model (SEM). In addition, this study established a SEM based on quantitative data from actual case studies as opposed to previous SEM studies that mainly use qualitative data. The SEM developed in this study can identify the project characteristics that affect the level of project performance required by owner in the planning stage, and is thus expected to help facilitate the decisionmaking process in the early planning stage of a project. 2009 Elsevier Ltd. All rights reserved.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

DEVELOPING THE LSM VPR SCHEDULING METHOD FOR SCHEDULING HIGHWAY CONSTRUCTION PROJECTS BASED ON EFFECTIVE FACTORS ON EMBANKMENT ACTIVITY PRODUCTIVITY

Highway construction projects are one of the most important construction projects in the world. Therefore predicting the time of these kinds of projects is important. Basically highway projects are including few activities which are repeating along the horizontal direction. One of the best methods for scheduling these types of projects is linear scheduling method. The repetitive nature of the h...

متن کامل

Time Prediction Using a Neuro-Fuzzy Model for Projects in the Construction Industry

This paper presents a prediction model based on a new neuro-fuzzy algorithm for estimating time in construction projects. The output of the proposed prediction model, which is employed based on a locally linear neuro-fuzzy (LLNF) model, is useful for assessing a project status at different time horizons. Being trained by a locally linear model tree (LOLIMOT) learning algorithm, the model is int...

متن کامل

A Model for Prioritizing the Risks Associated with Road Construction Projects Based on Generalized Secondary Goal

   This paper aims at providing a new model based on Data Envelopment Analysis (DEA) to prioritize project risks. It is clear that the large amounts of involved capitals, the long term of infrastructure projects’ implementation, and the project management problems in on-time completion of projects indicate the necessity of paying particular attention to this issue and conducting applied researc...

متن کامل

Evaluation of Project Critical Success Factors for Key Construction Players and Objectives

Critical Success Factors (CSFs) are used to support and evaluate the success of a strategic and tactical approach in project implementation in order to increase the probability of success. This system is used by executors in project delivery to achieve improved performance capabilities with limited resources. The present paper aims to identify the impact of CSFs amongst the main elements involv...

متن کامل

A MATHEMATICAL MODEL FOR SELECTING THE PROJECT RISK RESPONSES IN CONSTRUCTION PROJECTS

Risks are natural and inherent characteristics of major projects. Risks are usually considered independently in analysis of risk responses. However, most risks are dependent on each other and independent risks are rare in the real world. This paper proposes a model for proper risk response selection from the responses portfolio with the purpose of optimization of defined criteria for projects. ...

متن کامل

Multi-criteria approach to project portfolio selection considering structural hardness and correlations between projects

Project portfolio selection is very important subject of decision-makers in project-based organizations. The best assignment of resources to the most appropriate projects is necessary as financing projects with low benefit is just waste of organization's resources. However, existing project selection models pay not much attention the structure and special features of projects as a selection cri...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Expert Syst. Appl.

دوره 36  شماره 

صفحات  -

تاریخ انتشار 2009