A Fast Algorithm for Scheduling Instructions with Deadline Constraints on RISC Machines

نویسندگان

  • Hui Wu
  • Joxan Jaffar
  • Roland Yap
چکیده

We present a fast algorithm for scheduling UET(Unit Execution Time) instructions with deadline constraints in a basic block on RISC machines with multiple processors. Unlike Palem and Simon's algorithm, our algorithm allows latency of lij = 1 which denotes that instruction vj cannot be started before vi. The time complexity of our algorithm is O(ne+ nd), where n is the number of instructions, e is the number of edges in the precedence graph and d is the maximum latency. Our algorithm is guaranteed to compute a feasible schedule whenever one exists in the following special cases: 1) Arbitrary precedence constraints, latencies in f0; 1g and one processor. In this special case, our algorithm improves the existing fastest algorithm from O(ne + e0 logn) to O(minfne; n2:376g), where e0 is the number of edges in the transitively closed precedence graph. 2) Arbitrary precedence constraints, latencies in f 1; 0g and two processors. In the special case where all latencies are 0, our algorithm degenerates to Garey and Johnson's two processor algorithm. 3) Special precedence constraints in the form of monotone interval graph, arbitrary latencies in f 1; 0; 1; ; dg and multiple processors. 4) Special precedence constraints in the form of in-forest, equal latencies and multiple processors. In the above special cases, if no feasible schedule exists, our algorithm will compute a schedule with minimum lateness. Moreover, by setting all deadlines to a sufficiently large integer, our algorithm will compute a schedule with minimum length in all the above special cases and the special case of out-forest, equal latencies and multiple processors.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Instruction Scheduling with Timing Constraints on Multiple RISC Processors

We present a fast approximation algorithm for scheduling UET(Unit Execution Time) instructions with precedence constraints in the form of a DAG, latency constraints where the latency between any two instructions is a non-negative integer, timing constraints in the form of individual integer release times and deadlines in a basic block on multiple RISC processors. In general case where latencies...

متن کامل

A Clustering Approach to Scientific Workflow Scheduling on the Cloud with Deadline and Cost Constraints

One of the main features of High Throughput Computing systems is the availability of high power processing resources. Cloud Computing systems can offer these features through concepts like Pay-Per-Use and Quality of Service (QoS) over the Internet. Many applications in Cloud computing are represented by workflows. Quality of Service is one of the most important challenges in the context of sche...

متن کامل

Minimizing the Number of Tardy Jobs in the Single Machine Scheduling Problem under Bimodal Flexible and Periodic Availability Constraints

In single machine scheduling problems with availability constraints, machines are not available for one or more periods of time. In this paper, we consider a single machine scheduling problem with flexible and periodic availability constraints. In this problem, the maximum continuous working time for each machine increases in a stepwise manner with two different values allowed. Also, the durati...

متن کامل

Multi-Objective Unrelated Parallel Machines Scheduling with Sequence-Dependent Setup Times and Precedence Constraints

This paper presents a novel, multi-objective model of a parallel machines scheduling problem that minimizes the number of tardy jobs and total completion time of all jobs. In this model, machines are considered as unrelated parallel units with different speeds. In addition, there is some precedence, relating the jobs with non-identical due dates and their ready times. Sequence-dependent setup t...

متن کامل

MILP Formulation and Genetic Algorithm for Non-permutation Flow Shop Scheduling Problem with Availability Constraints

In this paper, we consider a flow shop scheduling problem with availability constraints (FSSPAC) for the objective of minimizing the makespan. In such a problem, machines are not continuously available for processing jobs due to preventive maintenance activities. We proposed a mixed-integer linear programming (MILP) model for this problem which can generate non-permutation schedules. Furthermor...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2000