Access network design with capacity-dependent costs
نویسندگان
چکیده
This article adresses the topological design problem of access networks. The topology of such networks is often designed assuming capacity-independent costs for the links and neglecting other equipment costs. However, with the massive deployment of optical fiber in all western countries, the cost of leasing transmission lines becomes cheaper and cheaper, and equipment costs are now a significant fraction of the total cost when designing a network. The main contribution of this paper is to integrate the cost of the equipements in the topological design of access networks. An exact algorithm and two heuristics are proposed to solve this problem.
منابع مشابه
A Hybrid Solution Method for Hub-and-Spoke Network Design under Uncertainty
Supply chain is an integrated system of facilities and activities. Gaining the optimum design of demand satisfaction network is one of the most important live issues in the decision making problems category. Most of previous studies considered unreal assumptions such as the lack of capacity constraints to satisfy demand in the network and in hubs. By considering the nature of the case that have...
متن کاملDesign of a Reliable Facility Location Model for Health Service Networks
This paper proposes a novel facility location model for health service network design by considering different key elements including the reliability aspects, service capacity, congestion, service quality, surrounding public infrastructures, geographical accessibility and several types of cost such as investment, transportation and operational costs. We formulate the problem as a robust scenari...
متن کاملA fuzzy capacitated facility location-network design model: A hybrid firefly and invasive weed optimization (FIWO) solution
Facility location-network design (FLND) problem, which determines the location of facilities and also communication links between the demand and facility nodes, is arisen from the combination of the facility location and network design problems. This paper deals with fuzzy capacitated facility location-network design model which aims to select the facilities and candidate links in a way that yi...
متن کاملA Two-Stage Chance-Constraint Stochastic Programming Model for Electricity Supply Chain Network Design
Development of every society is incumbent upon energy sector’s technological and economic effectiveness. The electricity industry is a growing and needs to have a better performance to effectively cover the demand. The industry requires a balance between cost and efficiency through careful design and planning. In this paper, a two-stage stochastic programming model is presented for the design o...
متن کاملAn Integrated Hydrocarbon Biofuel and Petroleum Supply Chain: Designing and Planning a Dynamic Supply Chain Network
One of the main challenges of bioenergy sector development is the cost of biomass supply chain resulted from inefficient bioenergy production from low energy content biomass feedstocks, high logistics costs of biomass production, handling and transportation. Another main aspect to be considered is that the configuration of a biofuel supply chain can be dynamic which evolve over time. Growing de...
متن کامل