An indirect search algorithm for disaster restoration with precedence and synchronization constraints
نویسندگان
چکیده
When a massive disaster occurs, to repair the damaged part of lifeline networks, planning is needed to appropriately allocate tasks to two or more restoration teams and optimize their traveling routes. However, precedence and synchronization constraints make restoration teams interdependent of one another, and impede a successful solution by standard local search. In this paper, we propose an indirect local search method using the product set of team-wise permutations as an auxiliary search space. It is shown that our method successfully avoids the interdependence problem induced by the precedence and synchronization constraints, and that it has the big advantage of non-deteriorating perturbations being available for iterated local search.
منابع مشابه
SINGLE MACHINE DUE DATE ASSIGNMENT SCHEDULING PROBLEM WITH PRECEDENCE CONSTRAINTS AND CONTROLLABLE PROCESSING TIMES IN FUZZY ENVIRONMENT
In this paper, a due date assignment scheduling problem with precedence constraints and controllable processing times in uncertain environment is investigated, in which the basic processing time of each job is assumed to be the symmetric trapezoidal fuzzy number, and the linear resource consumption function is used.The objective is to minimize the crisp possibilistic mean (or expected) value of...
متن کاملA Cuckoo search algorithm (CSA) for Precedence Constrained Sequencing Problem (PCSP)
Precedence constrained sequencing problem (PCSP) is related to locate the optimal sequence with the shortest traveling time among all feasible sequences. In PCSP, precedence relations determine sequence of traveling between any two nodes. Various methods and algorithms for effectively solving the PCSP have been suggested. In this paper we propose a cuckoo search algorithm (CSA) for effectively ...
متن کاملIntegrated Process Planning and Active Scheduling in a Supply Chain-A Learnable Architecture Approach
Through the lens of supply chain management, integrating process planning decisions and scheduling plans becomes an issue of great challenge and importance. Dealing with the problem paves the way to devising operation schedules with minimum makespan; considering the flexible process sequences, it can be viewed as a fundamental tool for achieving the scheme, too. To deal with this integration, t...
متن کاملAN OPTIMIZATION-BASED COMPARATIVE STUDY OF DOUBLE LAYER GRIDS WITH TWO DIFFERENT CONFIGURATIONS USING CUCKOO SEARCH ALGORITHM
This paper is concerned with the economical comparison between two commonly used configurations for double layer grids and determining their optimum span-depth ratio. Two ranges of spans as small and big sizes with certain bays of equal length in two directions and various types of element grouping are considered for each type of square grids. In order to carry out a precise comparison between ...
متن کاملA Hybrid Unconscious Search Algorithm for Mixed-model Assembly Line Balancing Problem with SDST, Parallel Workstation and Learning Effect
Due to the variety of products, simultaneous production of different models has an important role in production systems. Moreover, considering the realistic constraints in designing production lines attracted a lot of attentions in recent researches. Since the assembly line balancing problem is NP-hard, efficient methods are needed to solve this kind of problems. In this study, a new hybrid met...
متن کامل