A Grasp with Path-Relinking for the Workover Rig Scheduling Problem
نویسندگان
چکیده
Onshore oil wells depend on special services like cleaning, reinstatement and stimulation. These services, which are performed by a short number of workover rigs, are important to keep oil production as optimum as possible. Consequently, scheduling must be determined, where several factors interfere, such as production, service to be performed on each well, and time windows for each service. When a well needs service, its production is interrupted. In this regard, the workover rig scheduling problem consists of finding the best sequence of wells, which minimizes the production loss associated with the wells waiting for maintenance. In this paper, the authors present a Greedy Randomized Adaptive Search Procedure (GRASP) with Path-Relinking (PR) to solve this problem. Computational results are obtained from real problems of a Brazilian oil field. DOI: 10.4018/978-1-4666-1574-8.ch005
منابع مشابه
Parallel Strategies for Grasp with Path-relinking
A Greedy Randomized Adaptive Search Procedure (GRASP) is a metaheuristic for combinatorial optimization. It usually consists of a construction procedure based on a greedy randomized algorithm and local search. Path-relinking is an intensification strategy that explores trajectories that connect high quality solutions. We analyze two parallel strategies for GRASP with path-relinking and propose ...
متن کاملA Metaheuristic Algorithm for the Minimum Routing Cost Spanning Tree Problem
The routing cost of a spanning tree in a weighted and connected graph is defined as the total length of paths between all pairs of vertices. The objective of the minimum routing cost spanning tree problem is to find a spanning tree such that its routing cost is minimum. This is an NP-Hard problem that we present a GRASP with path-relinking metaheuristic algorithm for it. GRASP is a multi-start ...
متن کاملGRASP with path-relinking for the generalized quadratic assignment problem
The generalized quadratic assignment problem (GQAP) is a generalization of the NP-hard quadratic assignment problem (QAP) that allows multiple facilities to be assigned to a single location as long as the capacity of the location allows. The GQAP has numerous applications, including facility design, scheduling, and network design. In this paper, we propose several GRASP with path-relinking heur...
متن کاملParallel GRASP with path-relinking for job shop scheduling
In the job shop scheduling problem (JSP), a finite set of jobs is processed on a finite set of machines. Each job is required to complete a set of operations in a fixed order. Each operation is processed on a specific machine for a fixed duration. A machine can process no more than one job at a time and once a job initiates processing on a given machine it must complete processing without inter...
متن کاملScheduling workover rigs for onshore oil production
Many oil wells in Brazilian onshore fields rely on artificial lift methods. Maintenance services such as cleaning, reinstatement, stimulation and others are essential to these wells. These services are performed by workover rigs, which are avaliable on a limited number with respect to the number of wells demanding service. The decision of which workover rig should be sent to perform some mainte...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- IJNCR
دوره 1 شماره
صفحات -
تاریخ انتشار 2010