No-wait flowshops with bicriteria of makespan and maximum lateness

نویسندگان

  • Ali Allahverdi
  • Tariq A. Aldowaisan
چکیده

In this work we study a flowshop scheduling problem in which jobs are not allowed to wait in-between machines, a situation commonly referred to as no-wait. The concerned criterion is to minimize a weighted sum of makespan and maximum lateness. A dominance relation for the case of three-machine is presented and evaluated by experimental designs. Several heuristics and local search methods are proposed for the general m-machine case. The local search methods are based on genetic algorithms and iterated greedy procedures. An extensive computational analysis is conducted where it is shown that the proposed methods outperform existing heuristics and metaheuristics in all tested scenarios by a considerable margin and under identical CPU times.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Lotstreaming with Equal Sublots in No-wait Flowshops

We consider the problem of minimizing makespan in a no-wait flow-shop with an arbitrary number of machines. We assume that all sublots have the same number of items. We consider the cases with or without loading times. In both cases we show the existence of a critical machine which never remains idle. Then we get a set of general conditions on the processing times and loading times, which bind ...

متن کامل

Particle Swarm Optimization Algorithm for Makespan and Maximum Lateness Minimization in Permutation Flowshop Sequencing Problem

In this paper, a particle swarm optimization algorithm (PSO) is presented to solve the permutaion flowshop sequencing problem (PFSP) with the objectives of minimizing makespan and maximum lateness of jobs, respectively. Simple but very efficient local search based on variable neighborhood search (VNS) is embedded in the particle swarm optimization algorithm to solve the well known benchmark sui...

متن کامل

Algorithms for no-wait flowshops with total completion time subject to makespan

The m-machine no-wait flowshop scheduling problem, with the objective of minimizing total completion time subject to the constraint that makespan has to be less than or equal to a certain value, is addressed in this paper. First, an algorithm is proposed to find an upper bound on the makespan in case the upper bound is not given or unknown. Given the upper bound on makespan, a proposed algorith...

متن کامل

New Heuristics for No-Wait Flowshops with Performance Measures of Makespan and Mean Completion Time

 The m-machine no-wait flowshop scheduling problem is addressed by taking into account two performance measures of makespan and mean completion time. The objective is to minimize makespan such that mean completion time is less than a certain value. A dominance relation is provided for a special case of the problem. Moreover, two new heuristics are proposed in this paper. Computational analysis...

متن کامل

Solving Group Scheduling Problem in No-wait Flow Shop with Sequence Dependent Setup Times

Different manufacturing enterprises use regularly scheduling algorithms in order to help meeting demands over time and reducing operational costs. Nowadays, for a better useofresources and manufacturingin accordance withcustomer needs and given the level ofcompetitionbetweencompanies, employing asuitablescheduling programhasa double importance. Conventional productionmethods are constantly subs...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • European Journal of Operational Research

دوره 152  شماره 

صفحات  -

تاریخ انتشار 2004