We consider a multidimensional optimization problem in the framework of tropical mathematics. The problem is formulated to minimize a nonlinear objective function that is defined on vectors in a finitedimensional semimodule over an idempotent semifield and calculated by means of multiplicative conjugate transposition. We offer two complete direct solutions to the problem. The first solution consists of the derivation of a sharp lower bound for the objective function and the solution of an equation to find all vectors that yield the bound. The second is based on extremal properties of the spectral radius and involves the evaluation of the spectral radius of a certain matrix. We apply the result obtained to solve a real-world problem in project scheduling under the minimum makespan criterion. Key-Words: idempotent semifield, tropical mathematics, minimax optimization problem, project scheduling, minimum makespan. MSC (2010): 65K10, 15A80, 65K05, 90C48, 90B35
منابع مشابه
A Multi-objective optimization model for project scheduling with time-varying resource requirements and capacities
Proper and realistic scheduling is an important factor of success for every project. In reality, project scheduling often involves several objectives that must be realized simultaneously, and faces numerous uncertainties that may undermine the integrity of the devised schedule. Thus, the manner of dealing with such uncertainties is of particular importance for effective planning. A realistic sc...
متن کاملResource Constrained Project Scheduling with Material Ordering: Two Hybridized Meta-Heuristic Approaches (TECHNICAL NOTE)
Resource constrained project scheduling problem (RCPSP) is mainly investigated with the objective of either minimizing project makespan or maximizing project net present value. However, when material planning plays a key role in a project, the existing models cannot help determining material ordering plans to minimize material costs. In this paper, the RCPSP incorporated with the material order...
متن کاملOptimizing a bi-objective preemptive multi-mode resource constrained project scheduling problem: NSGA-II and MOICA algorithms
The aim of a multi-mode resource-constrained project scheduling problem (MRCPSP) is to assign resource(s) with the restricted capacity to an execution mode of activities by considering relationship constraints, to achieve pre-determined objective(s). These goals vary with managers or decision makers of any organization who should determine suitable objective(s) considering organization strategi...
متن کاملTropical optimization problems in project scheduling
We consider a project that consists of activities operating in parallel under various temporal constraints, including start-start, startfinish and finish-start precedence relations, early start, late start and late finish time boundaries, and due dates. Scheduling problems are formulated to find optimal schedules for the project under different optimality criteria to minimize, including the pro...
متن کاملAn Energy-efficient Mathematical Model for the Resource-constrained Project Scheduling Problem: An Evolutionary Algorithm
In this paper, we propose an energy-efficient mathematical model for the resource-constrained project scheduling problem to optimize makespan and consumption of energy, simultaneously. In the proposed model, resources are speed-scaling machines. The problem is NP-hard in the strong sense. Therefore, a multi-objective fruit fly optimization algorithm (MOFOA) is developed. The MOFOA uses the VIKO...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Annals OR
دوره 256 شماره
صفحات -
تاریخ انتشار 2017