Contractual Date of Delivery M
ثبت نشده
چکیده
This document provides an overview of all NoAH components, defines their requirements and describes the interface between them. The NoAH architecture, as described so far, is a set of individual components that cooperate to form a farm of distributed honeypots. Although the main NoAH components –low-and high-interaction honeypots, signature generation, honey@home and funneling/tunneling – can work individually, they need a well-defined interface between them in order to cooperate. In this deliverable we set the interfaces between honey@home and the NoAH core, low-interaction honeypots with high-interaction ones and finally high-interaction honeypots with signature generation mechanisms. Furthermore, besides the traffic and detection components, a complete architecture requires a database that will store meta-data about honeypot status, data collected and operational roles. We describe the design of the database also in this document.
منابع مشابه
D5.4 Market Survey Report Project Full Title People and Knowledge Cross Lingual Information Gathering Security (distribution Level) Public
Contractual date of delivery "M18 = June 2002" Actual date of delivery "31 of July 2002" Deliverable number D54 Deliverable name Market Survey
متن کاملR & D Cooperations with Organizations of non - European Countries
This document describes the design of the early warning system and presents the results of preliminary measurements. Contractual Date of Delivery 12 January 2005 Actual Date of Delivery 12 January 2005 Deliverable Security Class Public Editor Periklis Akritidis The EAR Consortium consists of: FORTH Coordinator Greece GA Tech Principal Contractor USA FORTHnet Principal Contractor Greece
متن کاملD:D-2.1 Architecture guidelines and principles
Contractual Date of Delivery (release): M9 [changed to M15]
متن کاملInternet of Things Architecture
Doc. Ref.: Responsible Beneficiary : Editor(s): Edward Ho (HSG) List of contributors: Alain Pastor (ALBLF), Edward Ho (HSG), Alexander Salinas Segura (UniW), Ralf Kernchen (UniS), Sonja Meyer (SAP), Johannes Riedl (Siemens), Alessandro Bassi (HEU) Reviewers: Alexander Salinas Segura (UniW) Contractual Delivery Date: M3 Actual Delivery Date: November 30, 2010 Status: Final Version and date Chang...
متن کاملOperational Programme “ Competitiveness ” R & D Cooperations with Organizations of non - European Countries
This document describes the implementation of the EAR Early Warning System for Internet-Based Cyber-Attacks. The deliverable is accompanied by a Compact Disc containing the relevant source code. Contractual Date of Delivery 12 May 2005 Actual Date of Delivery 12 May 2005 Deliverable Security Class Public Editor Periklis Akritidis The EAR Consortium consists of: FORTH Coordinator Greece GA Tech ...
متن کاملSixth Framework Programme Structuring the European Research Area Specific Programme Research Infrastructures Action Contractual Date of Delivery M12 Actual Date of Delivery M13 Deliverable Security Class Public
This document describes the design of the NoAH containment environment. The environment, known as Argos, is intended for use in a high-interaction honeypot that runs real services on any operating system. Unlike most other systems, we do not require the traffic arriving at the honeypot to be suspect to begin with, as Argos is designed to detect zero-day attacks.
متن کامل