Balancing Disassembly Line in Product Recovery to Promote the Coordinated Development of Economy and Environment
نویسندگان
چکیده
For environmentally conscious and sustainable manufacturing, many more manufacturers are acting to recycle and remanufacture their post-consumed products. The most critical process of remanufacturing is disassembly, since it allows for the selective extraction of the valuable components and materials from returned products to reduce the waste disposal volume. It is, therefore, important to design and balance the disassembly line to work efficiently due to its vital role in effective resource usage and environmental protection. Considering the disassembly precedence relationships and sequence-dependent parts removal time increments, this paper presents an improved discrete artificial bee colony algorithm (DABC) for solving the sequence-dependent disassembly line balancing problem (SDDLBP). The performance of the proposed algorithm was tested against nine other approaches. Computational results evidently indicate the superior efficiency of the proposed algorithm for addressing the environmental and economic concerns while optimizing the multi-objective SDDLBP.
منابع مشابه
A cost-oriented model for multi-manned assembly line balancing problem
In many real world assembly line systems which the work-piece is of large size more than one worker work on the same work-piece in each station. This type of assembly line is called multi-manned assembly line (MAL). In the classical multi-manned assembly line balancing problem (MALBP) the objective is to minimize the manpower needed to manufacture one product unit. Apart from the manpower, othe...
متن کاملWaste Management of Building Ceramic Materials Using the DfD Technique: Sustainable Development and Environmentally Friendly
Nowadays, in modern societies, growing activities in construction affairs and their economic development have been resulted construction wastes and so much demolition in the past three decades. Most of these wastes have not been treated and therefore caused severe damages to the environment. In this research, after reviewing construction and demolition management methods and their accesso...
متن کاملA New U-Shaped Heuristic for Disassembly Line Balancing Problems
The product recovery operations are fully based on disassembly line balancing. The disassembly line is a best chaise of automated disassembly or returned product. It is very difficult to find the optimal balance of a disassembly line because of its N-P hard nature. In this paper a new U-shaped heuristic is proposed to assign the parts to the disassembly work stations under precedence constraint...
متن کاملFuzzy multi-objective assembly line balancing problem: Fuzzy mathematical programming approach
Design of assembly line is done in order to more coordinate a collection of some consecutive work stations for the aim of obtaining more productivity from the work stations and workers. The stations are arranged in a way to have a continuous and constant material flow. In this paper a multi-objective formulation for assembly line balancing is introduced. As a solution approach a two-step approa...
متن کاملکاربرد روشهای هیورستیک اولویت وزنی و طولانی ترین زمان عملیات (LCR) متعادل سازی خطوط مونتاژ و تاثیر آن بر عملکرد سازمان
According to researches, one of the productivity barriers among many organizations is assembly line balancing problem, which needs scientific models to be solved. This paper examines the effect of line balancing on the functioning of assembly line in two sections. In the first section, after studying the theoretic bases and reviewing the literature, we have discussed the assembly concepts, diff...
متن کامل