Joint determination of rotation cycle time and number of shipments for a multi-item EPQ model with random defective rate
نویسندگان
چکیده
a r t i c l e i n f o JEL classification: C02 M11 C44 C61 Keywords: Multi-item production system Rotation cycle time Multi-delivery Economic production quantity model Scrap Vendor–buyer integrated system This paper addresses the joint determination of a rotation cycle time and number of shipments for a multi-item economic production quantity (EPQ) model with random defective rate. The classic EPQ model considers production planning for a single product with a perfect production process and continuous inventory issuing policy for its finished goods. However, in real vendor–buyer integrated systems, the multi-delivery policy is often used in lieu of the continuous issuing policy, and due to various uncontrollable factors, the generation of defective items is inevitable. Furthermore, in order to maximize machine utilization, management often plans the production of m products in turn on a single machine, rather than a single product on one machine, as assumed by the EPQ model. Therefore, by assuming that all defective items produced are scrap, this study aims to jointly determine the optimal rotation cycle time and number of shipments that minimize the long-run average cost for such an imperfect quality multi-item EPQ model. We employ mathematical modeling with the renewal reward theorem and obtain closed-form optimal operating policies for the proposed model. Further, we demonstrate the practical use of the results by using a numerical example and sensitivity analysis. The economic production quantity (EPQ) model was introduced (Taft, 1918) to assist the manufacturing firms in deciding the optimal batch size that would minimize the expected production–inventory costs. The classic EPQ model considers production planning for single product with perfect production process, and a continuous inventory issuing policy for its finished goods. However, in real vendor–buyer integrated systems: (1) the multi-delivery policy is often used in lieu of the continuous issuing policy, and (2) due to various uncontrollable factors, generation of defective items is inevitable. Studies that related to different aspects of multi-delivery vendor–buyer systems are surveyed as follows. Goyal (1977) studied an integrated single supplier–single customer problem. He presented a method that is typically applicable to the inventory problems where a product is procured by a single customer from a single supplier using examples to demonstrate his proposed model. Schwarz et al. (1985) studied the system fill-rate of a one-warehouse N-identical retailer distribution system as a function of warehouse and retailer safety stock. They employed an approximation model from a prior study …
منابع مشابه
A note on joint determination of the rotation cycle time and number of shipments for a multi- item EPQ model with a random defective rate
This study proposes a two-phase, algebraic approach to resolve the rotation cycle time and number of shipments for a multi-item, economic production quantity (EPQ) model with a random defective rate. A conventional method for solving a multi-item EPQ model is to use differential calculus and Hessian matrix equations on system cost function to prove convexity first and then derive an optimal pro...
متن کاملJoint Determination of the Production Lot Size and Number of Shipments for Epq Model with Rework
This paper is concerned with joint determination of the optimal lot size and optimal number of shipments for an economic production quantity (EPQ) model with the reworking of random defective items produced. The classic EPQ model assumes a continuous issuing policy for satisfying product demand and perfect quality production for all items produced. However, in a real life vendor-buyer integrate...
متن کاملEasy and Improved Algorithms to Joint Determination of the Replenishment Lot Size and Number of Shipments for an Epq Model with Rework
Recently, in Mathematical and Computational Applications Journal Chiu et al. [1] and Chen and Chiu [2] propose an inventory model based on EPQ with rework to determine the replenishment lot size and the number of shipments for a vendor-buyer integrated production-inventory system. They solve the inventory problem by considering both variables as continuous. However, the number of shipments must...
متن کاملJOINT ECONOMIC LOT SIZING PROBLEM IN A TWO ECHELON PRODUCTION SYSTEM WITH FINITE PRODUCTION RATE AND LEAD TIME
In this study, a two-echelon supplier-manufacturer system with finite production rate and lead time is proposed. It is assumed that shortage is not permitted and the lot size of manufacturer (second echelon) is m-factors of the lot size of supplier (first echelon) and supplier can supply the manufacturer’s lot size in several shipments in each cyc...
متن کاملReplenishment Lot Size and Number of Shipments for Epq Model Derived without Derivatives
This paper investigates optimal replenishment lot size and optimal number of shipments for economic production quantity (EPQ) model with rework process using an algebraic approach. The classic EPQ model assumes a perfect quality production for all items produced and a continuous issuing policy for satisfying customer‟s demand. However, in a real life vendor-buyer integrated-production-inventory...
متن کامل