A Project Information
ثبت نشده
چکیده
• Submission date: September 14, 2015. • Project Lead: Michael Shay, University of Delaware • NSF Award: Collaborative Research: Super-Alfvénic propagation of energy released during magnetic reconnection in the Earth’s magnetotail, Award # AGS-1219382, 9/1/2013 8/31/2016, Program Officer: Janet Kozyra, PI: Michael Shay, University of Delaware. Note: Dr. Shay will be applying for a no-cost extension of this grant, leading to an end date of 8/31/2017.
منابع مشابه
Information Technology for Project Cost Management (Case study: Soufian Cement Co, Iran)
In today's competitive world, reduction of production costs has become one of the corporates priorities. Survival triangle (cost, quality and time) is the solution that helps companies focus on these three dimensions and have the ability to compete with other companies. Cost management is the first step in this way that providing solutions and advice to managers who need help to have a precise ...
متن کاملAPPLICATION OF DEA FOR SELECTING MOST EFFICIENT INFORMATION SYSTEM PROJECT WITH IMPRECISE DATA
The selection of best Information System (IS) project from many competing proposals is a critical business activity which is very helpful to all organizations. While previous IS project selection methods are useful but have restricted application because they handle only cases with precise data. Indeed, these methods are based on precise data with less emphasis on imprecise data. This paper pro...
متن کاملTowards Measuring the Project Management Process During Large Scale Software System Implementation Phase
Project management is an important factor to accomplish the decision to implement large-scale software systems (LSS) in a successful manner. The effective project management comes into play to plan, coordinate and control such a complex project. Project management factor has been argued as one of the important Critical Success Factor (CSF), which need to be measured and monitored carefully duri...
متن کاملEvaluation of success rate hospital information system project, using gap analysis model in Shahid Mohammadi hospital, Bandar Abbas, Iran
Introduction: Every project of information systems is to develop by four main stages of analysis design, implementation and evaluation. This study was addressed to determine the current and desired status of benefits achieved in hospital information system and evaluate the success rate of hospital information system project in Shahid Mohammadi hospital, Bandar Abbas, Iran. Methods: This cross -...
متن کاملReal-Time Building Information Modeling (BIM) Synchronization Using Radio Frequency Identification Technology and Cloud Computing System
The online observation of a construction site and processes bears significant advantage to all business sector. BIM is the combination of a 3D model of the project and a project-planning program which improves the project planning model by up to 6D (Adding Time, Cost and Material Information dimensions to the model). RFID technology is an appropriate information synchronization tool between the...
متن کاملA fuzzy multi-objective model for a project management problem
In this research, the multi-objective project management decision problem with fuzzy goals and fuzzy constraints are considered. We constitute α-cut approach and two various fuzzy goal programming solution methods for solving the Multi-Objective Project Management (MOPM) decision problem under fuzzy environments. The Interactive fuzzy multi-objective linear programming (i-FMOLP) and Weighted Ad...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2015