Single machine scheduling problems with financial resource constraints: Some complexity results and properties

نویسندگان

  • Evgeny R. Gafarov
  • Alexander A. Lazarev
  • Frank Werner
چکیده

We consider single machine scheduling problems with a non-renewable resource. This type of problems has not been intensively investigated in the literature so far. For several problems of this type with standard objective functions (namely the minimization of makespan, total tardiness, number of tardy jobs, total completion time and maximum lateness), we present some complexity results. Particular attention is given to the problem of minimizing total tardiness. In addition, for the so-called budget scheduling problem with minimizing the makespan, we present some properties of feasible schedules.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Minimizing the Number of Tardy Jobs in the Single Machine Scheduling Problem under Bimodal Flexible and Periodic Availability Constraints

In single machine scheduling problems with availability constraints, machines are not available for one or more periods of time. In this paper, we consider a single machine scheduling problem with flexible and periodic availability constraints. In this problem, the maximum continuous working time for each machine increases in a stepwise manner with two different values allowed. Also, the durati...

متن کامل

SINGLE MACHINE DUE DATE ASSIGNMENT SCHEDULING PROBLEM WITH PRECEDENCE CONSTRAINTS AND CONTROLLABLE PROCESSING TIMES IN FUZZY ENVIRONMENT

In this paper, a due date assignment scheduling problem with precedence constraints and controllable processing times in uncertain environment is investigated, in which the basic processing time of each job is assumed to be the symmetric trapezoidal fuzzy number, and the linear resource consumption function is used.The objective is to minimize the crisp possibilistic mean (or expected) value of...

متن کامل

A note on the paper 'Single machine scheduling problems with financial resource constraints: Some complexity results and properties' by E.R. Gafarov et al

In the article E.R. Gafarov, A.A. Lazarev, F. Werner, Single machine scheduling problems with financial resource constraints: Some complexity results and properties, Mathematical Social Sciences, 62 (2011), 7–13, the followingmistake is found in Section 3.2, where the authors consider the problem denoted as 1|NR, dj = d, gj = g|  Tj and claim that it is NP-hard. In the proof, a reduction from ...

متن کامل

Single Machine Scheduling with a Non-renewable Financial Resource

In this paper, we consider single machine scheduling problems with a non-renewable resource. This type of problems has not been intensively investigated in the literature so far. For several problems of this type with standard objective functions (namely the minimization of makespan, total tardiness, number of tardy jobs, total completion time and maximum lateness), we present some complexity r...

متن کامل

Single-machine scheduling considering carryover sequence-dependent setup time, and earliness and tardiness penalties of production

Production scheduling is one of the very important problems that industry and production are confronted with it. Production scheduling is often planned in the industrial environments while productivity in production can improve significantly the expansion of simultaneous optimization of the scheduling plan. Production scheduling and production are two areas that have attracted much attention in...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Mathematical Social Sciences

دوره 62  شماره 

صفحات  -

تاریخ انتشار 2011