Single machine scheduling problems with financial resource constraints: Some complexity results and properties
نویسندگان
چکیده
We consider single machine scheduling problems with a non-renewable resource. This type of problems has not been intensively investigated in the literature so far. For several problems of this type with standard objective functions (namely the minimization of makespan, total tardiness, number of tardy jobs, total completion time and maximum lateness), we present some complexity results. Particular attention is given to the problem of minimizing total tardiness. In addition, for the so-called budget scheduling problem with minimizing the makespan, we present some properties of feasible schedules.
منابع مشابه
Minimizing the Number of Tardy Jobs in the Single Machine Scheduling Problem under Bimodal Flexible and Periodic Availability Constraints
In single machine scheduling problems with availability constraints, machines are not available for one or more periods of time. In this paper, we consider a single machine scheduling problem with flexible and periodic availability constraints. In this problem, the maximum continuous working time for each machine increases in a stepwise manner with two different values allowed. Also, the durati...
متن کاملSINGLE MACHINE DUE DATE ASSIGNMENT SCHEDULING PROBLEM WITH PRECEDENCE CONSTRAINTS AND CONTROLLABLE PROCESSING TIMES IN FUZZY ENVIRONMENT
In this paper, a due date assignment scheduling problem with precedence constraints and controllable processing times in uncertain environment is investigated, in which the basic processing time of each job is assumed to be the symmetric trapezoidal fuzzy number, and the linear resource consumption function is used.The objective is to minimize the crisp possibilistic mean (or expected) value of...
متن کاملA note on the paper 'Single machine scheduling problems with financial resource constraints: Some complexity results and properties' by E.R. Gafarov et al
In the article E.R. Gafarov, A.A. Lazarev, F. Werner, Single machine scheduling problems with financial resource constraints: Some complexity results and properties, Mathematical Social Sciences, 62 (2011), 7–13, the followingmistake is found in Section 3.2, where the authors consider the problem denoted as 1|NR, dj = d, gj = g| Tj and claim that it is NP-hard. In the proof, a reduction from ...
متن کاملSingle Machine Scheduling with a Non-renewable Financial Resource
In this paper, we consider single machine scheduling problems with a non-renewable resource. This type of problems has not been intensively investigated in the literature so far. For several problems of this type with standard objective functions (namely the minimization of makespan, total tardiness, number of tardy jobs, total completion time and maximum lateness), we present some complexity r...
متن کاملSingle-machine scheduling considering carryover sequence-dependent setup time, and earliness and tardiness penalties of production
Production scheduling is one of the very important problems that industry and production are confronted with it. Production scheduling is often planned in the industrial environments while productivity in production can improve significantly the expansion of simultaneous optimization of the scheduling plan. Production scheduling and production are two areas that have attracted much attention in...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Mathematical Social Sciences
دوره 62 شماره
صفحات -
تاریخ انتشار 2011