Solving the University Class Scheduling Problem Using Advanced ILP Techniques
نویسندگان
چکیده
The University Class Scheduling Problem (UCSP) is concerned with assigning a number of courses to classrooms taking into consideration constraints like classroom capacities and university regulations. The problem also attempts to optimize the performance criteria and distribute the courses fairly to classrooms depending on the ratio of classroom capacities to course enrollments. The problem is a classical scheduling problem and considered to be NP-complete. It has received some research during the past few years given its wide use in colleges and universities. Several formulations and algorithms have been proposed to solve scheduling problems, most of which are based on local search techniques. In this paper, we propose a complete approach using integer linear programming (ILP) to solve the problem. The ILP model of interest is developed and solved using the three advanced ILP solvers based on generic algorithms and Boolean Satisfiability (SAT) techniques. SAT has been heavily researched in the past few years and has lead to the development of powerful 0-1 ILP solvers that can compete with the best available generic ILP solvers. Experimental results indicate that the proposed model is tractable for reasonable-sized UCSP problems. Index Terms — University Class Scheduling, Optimization, Integer Linear Programming (ILP), Boolean Satisfiability.
منابع مشابه
A New ILP Model for Identical Parallel-Machine Scheduling with Family Setup Times Minimizing the Total Weighted Flow Time by a Genetic Algorithm
This paper presents a novel, integer-linear programming (ILP) model for an identical parallel-machine scheduling problem with family setup times that minimizes the total weighted flow time (TWFT). Some researchers have addressed parallel-machine scheduling problems in the literature over the last three decades. However, the existing studies have been limited to the research of independent jobs,...
متن کاملَA Multi-objective simulated annealing algorithm to solving flexible no-wait flowshop scheduling problems with transportation times
This paper deals with a bi-objective hybrid no-wait flowshop scheduling problem minimizing the makespan and total weighted tardiness, in which we consider transportation times between stages. Obtaining an optimal solution for this type of complex, large-sized problem in reasonable computational time by using traditional approaches and optimization tools is extremely difficult. This paper presen...
متن کاملA Flexible Job Shop Scheduling Problem with Controllable Processing Times to Optimize Total Cost of Delay and Processing
In this paper, the flexible job shop scheduling problem with machine flexibility and controllable process times is studied. The main idea is that the processing times of operations may be controlled by consumptions of additional resources. The purpose of this paper to find the best trade-off between processing cost and delay cost in order to minimize the total costs. The proposed model, flexibl...
متن کاملYard crane scheduling in port container terminals using genetic algorithm
Yard crane is an important resource in container terminals. Efficient utilization of the yard crane significantly improves the productivity and the profitability of the container terminal. This paper presents a mixed integer programming model for the yard crane scheduling problem with non- interference constraint that is NPHARD in nature. In other words, one of the most important constraints in...
متن کاملSolving the Employee Timetabling Problem Using Advanced SAT & ILP Techniques
The Employee Timetabling Problem (ETP) is concerned with assigning a number of employees into a given set of shifts over a fixed period of time while meeting the employee’s preferences and organizational work regulations. The problem also attempts to optimize the performance criteria and distribute the shifts equally among the employees. The problem is known to be a complex optimization problem...
متن کامل