Distributed Apportioning in a Power Network for providing Demand Response Services

نویسندگان

  • Sourav Patel
  • Sandeep Attree
  • Saurav Talukdar
  • Mangal Prakash
  • Murti V. Salapaka
چکیده

Greater penetration of Distributed Energy Resources (DERs) in power networks requires coordination strategies that allow for self-adjustment of contributions in a network of DERs, owing to variability in generation and demand. In this article, a distributed scheme is proposed that enables a DER in a network to arrive at viable power reference commands that satisfies the DERs local constraints on its generation and loads it has to service, while, the aggregated behavior of multiple DERs in the network and their respective loads meet the ancillary services demanded by the grid. The Net-load Management system for a single unit is referred to as the Local Inverter System (LIS) in this article . A distinguishing feature of the proposed consensus based solution is the distributed finite time termination of the algorithm that allows each LIS unit in the network to determine power reference commands in the presence of communication delays in a distributed manner. The proposed scheme allows prioritization of Renewable Energy Sources (RES) in the network and also enables auto-adjustment of contributions from LIS units with lower priority resources (non-RES). The methods are validated using hardware-in-the-loop simulations with Raspberry PI devices as distributed control units, implementing the proposed distributed algorithm and responsible for determining and dispatching realtime power reference commands to simulated power electronics interface emulating LIS units for demand response.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Coordinated resource scheduling in a large scale virtual power plant considering demand response and energy storages

Virtual power plant (VPP) is an effective approach to aggregate distributed generation resources under a central control. This paper introduces a mixed-integer linear programming model for optimal scheduling of the internal resources of a large scale VPP in order to maximize its profit. The proposed model studies the effect of a demand response (DR) program on the scheduling of the VPP. The pro...

متن کامل

Optimal Operation of Microgrid in the presence of Real-time Pricing Demand Response Program using Artificial Bee Colony Algorithm with a Modified Choice Function

Abstract: Microgrid is one of the newest technologies in power systems. Microgrid can usually has a set of distributed energy resources that makes it able to operate separate from power grid. Optimal operation of microgrids means the optimal dispatch of power resources through day and night hours. This thesis proposed a new method for optimal operation of microgrid. In this method, real-time pr...

متن کامل

A Stochastic Operational Planning Model for Smart Power Systems

Smart Grids are result of utilizing novel technologies such as distributed energy resources, and communication technologies in power system to compensate some of its defects. Various power resources provide some benefits for operation domain however, power system operator should use a powerful methodology to manage them. Renewable resources and load add uncertainty to the problem. So, independe...

متن کامل

Stochastic Unit Commitment in the Presence of Demand Response Program under Uncertainties

In this paper, impacts of various uncertainties such as random outages of generating units and transmission lines, forecasting errors of load demand and wind power, in the presence of Demand response (DR) programs on power generation scheduling are studied. The problem is modelled in the form of a two-stage stochastic unit commitment (UC) which by solving it, the optimal solutions of UC as well...

متن کامل

Assessing the Impact of Size and Site of DGs and SMs in Active Distribution Networks for Energy Losses Cost

The presence of responsive loads in the promising active distribution networks (ADNs) would definitely affect the power system problems such as distributed generations (DGs) studies. Hence, an optimal procedure is proposed herein which takes into account the simultaneous placement of DGs and smart meters (SMs) in ADNs. SMs are taken into consideration for the sake of successful implementing of ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • CoRR

دوره abs/1708.06414  شماره 

صفحات  -

تاریخ انتشار 2017