Utilization of CON1D at ArcelorMittal Dofasco’s No. 2 Continuous Caster for Crater End Determination
نویسندگان
چکیده
Accurate determination of the position of final solidification point or crater end at ArcelorMittal Dofasco’s No. 2 Continuous Caster (CC) is essential for maximizing both casting speed and equipment utilization. The caster is equipped with one 900-mm long, straight, water-cooled copper mold, and produces 218-mm thick slabs with a maximum width of ~1,600 mm. The casting speed range at the caster is presently ~1.0 – 1.7 m/min. The position of the crater end or caster metallurgical length is defined as the distance from the liquid steel meniscus to the point at which the strand becomes completely solid, as shown in Figure 1 [1]. It is obvious that if the crater end extends beyond the machine length, the final portion of the partially solidified strand will no longer be supported by rolls on the strand broad faces. The ferrostatic pressure transmitted from the meniscus via the liquid pool and acting internally on the steel shell will then cause this unconstrained portion of strand to bulge out excessively. This will ultimately lead to a whale formation at the caster exit. To prevent extensive damage to the casting machinery, this catastrophic situation has to be avoided at all costs. In other words, the crater end must always be contained within the support roll segments under all casting conditions.
منابع مشابه
Real-time Model-based Spray-cooling Control System for Steel Continuous Casting
This paper presents a new system to control secondary cooling water sprays in continuous casting of thin steel slabs, CONONLINE. It uses real-time numerical simulation of heat transfer and solidification within the strand as a software sensor, in place of unreliable temperature measurements. The one-dimensional finite-difference model, CON1D is adapted to create the real-time predictor of the s...
متن کاملDetermination of Soil Moisture Content at Bukit Bunuh Meteorite Impacted Area using Resistivity Method and Laboratory Test
Determination of soil moisture content is of vital importance to many fields of study; civil engineering, hydrology, agriculture, geology, ecology and forestry. The occurrence of impact crater in Bukit Bunuh, a meteorite impacted area, made it an area of great interest to many researchers. In view of the process of impact cratering, the subsurface soil characteristics such as moisture content o...
متن کاملStudy of Cc Narrow-face Taper Design – Influence of the Casting Speed and Steel Composition
The objectives in this work were to develop, calibrate, and apply a model to predict ideal taper profiles down the narrow faces of the SIDERAR slab casting mold for several different casting speeds, steel grades, flux powder compositions, and widths. A significant amount of original research was undertaken for this challenging problem. A finite difference model of transient 1-D heat conduction ...
متن کاملDevelopment of a Model for Transient Simulation and Control of a Continuous Steel Slab Caster
A two-dimensional heat transfer model for transient simulation and control of a continuous steel slab caster is described. Slab thermal and solidification conditions are computed by the model as a function of time-varying casting speed, secondary spray cooling water flow rates and temperature, slab thickness, steel chemistry, and pouring and ambient temperatures. A solidification model that inc...
متن کاملA Hybrid Modeling for Continuous Casting Scheduling Problem
This paper deals with a multi-agent-based interval type-2 fuzzy (IT2F) expert systemfor scheduling steel continuous casting. Continuous caster scheduling is a complex and extensiveprocess that needs expert staff. In this study, a distributed multi-agent-based structure is proposed as asolution. The agents used herein can cooperate with each other via various communication protocols.To facilitat...
متن کامل