Establishing the Optimal Solution for Obstacle Crossings. Application for Bridge Km.14+162 Placed on the Bypass of Bistrita City
نویسنده
چکیده
The Bistrita city bypass crosses obliquely at km 14+162 the Bistrita river and a local road. In the area where the bridge is situated the river has a width of about 50.00m and the local road has 5.00m, being located at 12.00m from the bank of Bistrita. The bridge should provide a roadway that is 7.80m wide and two sidewalks of 1.50m. The challenge is to design a bridge that allows the crossing of the two barriers (the river and the local road) in the most efficient way possible from an economical point of view, but in such a way that both the geometrical constraints and the design requirements contained in the family of the European standards Eurocodes are respected. In order to achieve this goal, the author has investigated the design situation by comparing different possible technical solutions, by conducting a series of parametric studies and by utilizing mathematical optimization techniques. Following these investigations a 100.00m long bridge resulted. The superstructure is a continuous beam with three spans: 20.00m + 60.00m + 20.00m and consists of a composite steel – concrete deck. The deck cross section is composed of two steel beams with variable height and a reinforced concrete slab disposed on top. This configuration of the superstructure leads to the development of negative reaction forces in the bearings located at the end points of the deck. The study has covered 8 key steps as follows: Establishing the technical solution. Establishing the number and the length of the spans. Setting the static scheme. Determining the optimal cross section of the steel beams. Setting longitudinal beam geometry. Establishing the number of beams in the cross section. Determining the optimal mounting order of the concrete slabs. Establishing the optimal type and distribution of the bearing devices.
منابع مشابه
Combining Structural and Non-Structural Measures for Optimal Management of Urban Surface Runoff Collection (Case Study: Ariafar Bridge in Mianroud Canal)
Today, various structural and non-structural solutions are used to control and reduce the negative effects of floods in investigation and executive projects. But what is certain is that the optimal solution to minimize flood damage is a combination of structural and non-structural methods (planning and response measures). It is essential to provide these solutions in a metropolis like Tehran be...
متن کاملOptimal Trajectory Planning of a Mobile Robot with Spatial Manipulator For Spatial Obstacle Avoidance
Mobile robots that consist of a mobile platform with one or many manipulators mounted on it are of great interest in a number of applications. Combination of platform and manipulator causes robot operates in extended work space. The analysis of these systems includes kinematics redundancy that makes more complicated problem. However, it gives more feasibility to robotic systems because of the e...
متن کاملDevelopment and Practical Application of a Bridge Management System (J-BMS) in Japan
This paper presents a new bridge management system (J-BMS). It is integrated with a concrete bridge rating expert system that can be used to evaluate the serviceability of existing concrete bridges. The proposed J-BMS not only evaluates the performance of bridges, but also offers a rehabilitation strategy based on a combination of maintenance cost minimization and quality maximization. In this ...
متن کاملOPTIMAL DESIGN OF NON-PRISMATIC REINFORCED CONCRETE BOX GIRDER BRIDGE: MINIMIZATION OF THE COST AND CO2 EMISSION
This paper presents a computational framework for optimal design of non-prismatic reinforced concrete box girder bridges. The variables include the geometry of the cross section, tapered length, concrete strength and reinforcement of box girders and slabs. These are obtained by the enhanced colliding bodies optimization algorithm to optimizing the cost and again CO2 emission. Loading and design...
متن کاملDevelopment and Practical Application of a Lifetime Management System for Prestressed Concrete Bridges
A practical Bridge Management System has been developed by the author, which is referred to as the Japanese Bridge Management System (J-BMS) for existing concrete bridges. This paper introduces a newly developed bridge management system for the prestressed concrete (PC) bridges (J-BMS PC version) which is integrated with the PC bridge rating expert system (PC-BREX). The proposed system is able ...
متن کامل