Algorithms for Special Single Machine Total Tardiness Problems

نویسندگان

  • Alexander A. Lazarev
  • Frank Werner
چکیده

The scheduling problem of minimizing total tardiness on a single machine is known to be NP -hard in the ordinary sense. In this paper, we consider the special case of the problem when the processing times pj and the due dates dj of the jobs j, j ∈ N = {1, 2, . . . , n}, are oppositely ordered: p1 ≥ p2 ≥ . . . ≥ pn and d1 ≤ d2 ≤ . . . ≤ dn. It is shown that already this special case is NP -hard in the ordinary sense, too. The set of jobs N is partitioned into k, 1 ≤ k ≤ n, subsets M1,M2, . . . ,Mk, Mν ⋂Mμ = ∅ for ν = μ, N = M1 ⋃M2 ⋃ . . .⋃Mk, such that maxi,j∈Mν |di − dj | ≤ minj∈Mν pj for each ν = 1, 2, . . . ,k. We propose algorithms which solve the problem: in O(kn ∑ pj) time if 1 ≤ k < n; in O(n2) time if k = n; and in O(n2) time if maxi,j∈N |di − dj| ≤ 1. The polynomial algorithms do neither require the conditions p1 ≥ p2 ≥ . . . ≥ pn mentioned above nor integer processing times to construct an optimal schedule. Finally, we apply the idea of the presented algorithm for the case k = 1 to the even-odd partition problem.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Minimizing a General Penalty Function on a Single Machine via Developing Approximation Algorithms and FPTASs

This paper addresses the Tardy/Lost penalty minimization on a single machine. According to this penalty criterion, if the tardiness of a job exceeds a predefined value, the job will be lost and penalized by a fixed value. Besides its application in real world problems, Tardy/Lost measure is a general form for popular objective functions like weighted tardiness, late work and tardiness with reje...

متن کامل

Minimizing Total Weighted Tardiness with Drop Dead Dates in Single Machine Scheduling Problem

  This paper deals with minimization of tardiness in single machine scheduling problem when each job has two different due-dates i.e. ordinary due-date and drop dead date. The drop dead date is the date in which jobs’ weights rise sharply or the customer cancels the order. A linear programming formulation is developed for the problem and since the problem is known to be NP-hard, three heuristic...

متن کامل

Single-machine scheduling considering carryover sequence-dependent setup time, and earliness and tardiness penalties of production

Production scheduling is one of the very important problems that industry and production are confronted with it. Production scheduling is often planned in the industrial environments while productivity in production can improve significantly the expansion of simultaneous optimization of the scheduling plan. Production scheduling and production are two areas that have attracted much attention in...

متن کامل

Development of a Set of Algorithms for the Multi-Project Scheduling Problems

In this paper, the problem of determining the best schedule for a set of projects has been modeled in the form of a generalized tardiness flowshop (GTF) problem. We develop a set of heuristic algorithms for minimizing the total tardiness of jobs in a GTF problem. In the generalized version of tardiness flowshop problems, a job is considered to be a collection of operations and there is a due da...

متن کامل

JIT single machine scheduling problem with periodic preventive maintenance

This article investigates a JIT single machine scheduling problem with a periodic preventive maintenance. Also to maintain the quality of the products, there is a limitation on the maximum number of allowable jobs in each period. The proposed bi-objective mixed integer model minimizes total earliness-tardiness and makespan simultaneously. Due to the computational complexity of the problem, mult...

متن کامل

Efficient Algorithms for Just-In-Time Scheduling on a Batch Processing Machine

Just-in-time scheduling problem on a single batch processing machine is investigated in this research. Batch processing machines can process more than one job simultaneously and are widely used in semi-conductor industries. Due to the requirements of just-in-time strategy, minimization of total earliness and tardiness penalties is considered as the criterion. It is an acceptable criterion for b...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2008