Jefferson Lab, a Status Report
نویسندگان
چکیده
Thomas Jefferson National Accelerator Facility (Jefferson Lab; formerly known as CEBAF), operates a 4 GeV, 200 PA continuous wave (CW) electron accelerator that re-circulates the beam five times through two superconducting 400 MeV linacs. Electrons can be extracted from any of the five recirculation passes and beam can be simultaneously delivered to the three experimental halls. As the commissioning stage nears completion, the accelerator is becoming a fully operational machine. Experiments in Hall C have been underway since November 1995 with beam powers of over 300 kW at various energies. Hall A has received beam for spectrometer commissioning, while Hall B is expected to receive its first beam in the fall of 1996. Accelerator availability of greater than 70% during physics runs and excellent beam quality have contributed to making Jefferson Lab a world class laboratory for accelerator-based electromagnetic nuclear physics. With the high performance of the superconducting RF cavities, machine upgrades to 6 GeV, and eventually 8 to 10 GeV are now in the planning stages. Operational and commissioning details concerning all aspects of the machine will be discussed.
منابع مشابه
Status of the Control System for the CLAS Detector at Jefferson Lab
A control system for Hall B at the Thomas Jefferson National Accelerator Facility is being developed within the framework of the Experimental Physics and Industrial Control System (EPICS). The Hall B equipment currently under EPICS control includes numerous beam line devices, high voltage power supplies, detector gas systems, and safety systems. The status of the control system is described.
متن کاملNeutron Transversity at Jefferson Lab
Nucleon transversity and single transverse spin asymmetries have been the recent focus of large efforts by both theorists and experimentalists. On-going and planned experiments from HERMES, COMPASS and RHIC are mostly on the proton or the deuteron. Presented here is a planned measurement of the neutron transversity and single target spin asymmetries at Jefferson Lab in Hall A using a transverse...
متن کاملl - ex / 0 10 90 04 v 2 1 1 Se p 20 01 1 Nucleon Structure in the Resonance Region ∗
I discuss recent results of inclusive and exclusive electroproduction experiments at Jefferson Lab. They include measurements of the spin response for protons and neutrons in the resonance region, exclusive single pion and multiple pion production to measure resonance transition multipoles, and searches for missing quark model states. A brief outlook to the new domain of Generalized Parton Dist...
متن کاملStatus of the N Program at Jefferson Lab
Recent results in electromagnetic excitation of nucleon resonance are presented, and confronted with theoretical predictions. Preliminary data in the search for missing states are discussed as well. PACS. 1 3.60.le, 13.88.+e
متن کاملAnnual Report for Period : 09 / 2010 - 08 / 2011 Submitted on : 10 / 01 / 2011
Undergraduate Student Name: Musalo, Chistopher Worked for more than 160 Hours: Yes Contribution to Project: During the summers of 2010 and 2011 (full-time), as well as during the academic year (parttime), Chris Musalo installed, tested, and benchmarked software to be used in the nuclear physics research program. He has begun using this software to perform simulations of Jefferson Lab accelerato...
متن کامل