Scientists raise alarms about fast tracking of transoceanic canal through Nicaragua.
نویسندگان
چکیده
Seeking economic growth and job creation to tackle the nation's extreme poverty, the Nicaraguan government awarded a concession to build an interoceanic canal and associated projects to a recently formed Hong Kong based company with no track record or related expertise. This concession was awarded without a bidding process and in advance of any feasibility, socio-economic or environmental impact assessments; construction has begun without this information. The 278 km long interoceanic canal project may result in significant environmental and social impairments. Of particular concern are damage to Lake Cocibolca, a unique freshwater tropical lake and Central America's main freshwater reservoir; damage to regional biodiversity and ecosystems; and socio-economic impacts. Concerned about the possibly irreparable damage to the environment and to native communities, conservationists and the scientific community at large are urging the Nicaraguan government to devise and reveal an action plan to address and mitigate the possible negative repercussions of this interoceanic canal and associated projects. Critical research needs for preparation of a comprehensive benefit-cost analysis for this megaproject are presented.
منابع مشابه
Rethink the Nicaragua Canal.
A t the end of 2014, construction began on the Grand Canal in Nicaragua, a project shrouded in secrecy since its inception 2.5 years ago. The Nicaraguan government showed scant evidence of having accounted for the impact on the environment and on local residents, or of having adequately consulted the public in selecting the final 278-km route. Such disregard should be alarming to everyone. Proj...
متن کاملThe imperiled fish fauna in the Nicaragua Canal zone
Large-scale infrastructure projects commonly have large effects on the environment. The planned construction of the Nicaragua Canal will irreversibly alter the aquatic environment of Nicaragua in many ways. Two distinct drainage basins (San Juan and Punta Gorda) will be connected and numerous ecosystems will be altered. Considering the project's far-reaching environmental effects, too few studi...
متن کاملExtracting Environmental Benefits from a New Canal in Nicaragua: Lessons from Panama
Biologists have raised objections to a new canal in Nicaragua, but in this Essay I argue that dire predictions of environmental catastrophe are exaggerated. I present an alternative view based on my research experience in Panama, where Canal operations foster forest conservation. Currently in Nicaragua, the rate of forest loss is so rapid that the canal cannot make it worse. Rather, I contend, ...
متن کامل1 Analysis of future land use changes and water 2 availability in the Nicaraguan Southwest as a result 3 of the construction of the Nicaragua Interoceanic 4 Canal 5
Nicaragua is preparing the construction of an interoceanic canal that will be the longest 16 and largest canal on earth. An environmental and social impact assessment has been published in 17 2014 supporting a general viability of the canal. Nonetheless, several scientist and societal actors 18 raised serious concerns regarding the social, economic and ecological sustainability. Despite an 19 o...
متن کاملCritical Uncertainties and Gaps in the Environmental- and Social-Impact Assessment of the Proposed Interoceanic Canal through Nicaragua
The proposed interoceanic canal will connect the Caribbean Sea with the Pacific Ocean, traversing Lake Nicaragua, the major freshwater reservoir in Central America. If completed, the canal would be the largest infrastructure-related excavation project on Earth. In November 2015, the Nicaraguan government approved an environmental and social impact assessment (ESIA) for the canal. A group of int...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
- Environmental science & technology
دوره 49 7 شماره
صفحات -
تاریخ انتشار 2015