On Solving Dynamic Shortest Path Problems

نویسندگان

  • E. K. Zavadskas
  • Ebrahim Nasrabadi
  • S. Mehdi Hashemi
چکیده

Given a dynamic network with n nodes and m arcs in which all attributes including travel times, travel costs and waiting costs may change dynamically over a time horizon T. The dynamic shortest path problem is to determine a path from a specified source node to every other node with minimal total cost, subject to the constraint that the total traverse time is at most T. This problem can be formulated in two ways depending on whether a discrete or continuous representation of time is used. In this paper, we present an O(nT(n+T)) time algorithm for solving the discrete-time version of dynamic shortest path problem.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

ALGORITHMS FOR BIOBJECTIVE SHORTEST PATH PROBLEMS IN FUZZY NETWORKS

We consider biobjective shortest path problems in networks with fuzzy arc lengths. Considering the available studies for single objective shortest path problems in fuzzy networks, using a distance function for comparison of fuzzy numbers, we propose three approaches for solving the biobjective prob- lems. The rst and second approaches are extensions of the labeling method to solve the sing...

متن کامل

Solving Stochastic Shortest-Path Problems with RTDP

We present a modification of the Real-Time Dynamic Programming (rtdp) algorithm that makes it a genuine off-line algorithm for solving Stochastic Shortest-Path problems. Also, a new domainindependent and admissible heuristic is presented for Stochastic Shortest-Path problems. The new algorithm and heuristic are compared with Value Iteration over benchmark problems with large state spaces. The r...

متن کامل

Dynamic Multi Period Production Planning Problem with Semi Markovian Variable Cost (TECHNICAL NOTE)

This paper develops a method for solving the single product multi-period production-planning problem, in which the production and the inventory costs of each period arc concave and backlogging is not permitted. It is also assumed that the unit variable cost of the production evolves according to a continuous time Markov process. We prove that this production-planning problem can be Stated as a ...

متن کامل

Cockpit Crew Pairing Problem in Airline Scheduling: Shortest Path with Resources Constraints Approach

Increasing competition in the air transport market has intensified active airlines’ efforts to keep their market share by attaching due importance to cost management aimed at reduced final prices. Crew costs are second only to fuel costs on the cost list of airline companies. So, this paper attempts to investigate the cockpit crew pairing problem. The set partitioning problem has been used for ...

متن کامل

Curve approximation and constrained shortest path problems

We study the following problem k-constrained shortest path problem: given an acyclic directed graph D = (V,E) with arc weights ci,j , (i, j) ∈ E, two nodes s and t and an integer k, nd a shortest st-path containing at most k arcs. An important application of the problem in linear curve approximation is discussed. Vertices and edges of associated polytopes are determined, and integrality of thes...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2008