Optimal Crashing and Buffering of Stochastic Serial Projects

نویسنده

  • Dan Trietsch
چکیده

Crashing stochastic activities implies changing their distributions to reduce the mean. This can involve changing the variance too. Therefore, crashing can change not only the expected duration of a project but also the necessary size of its safety buffer. We consider optimal crashing of serial projects where the objective is to minimize total costs including crashing cost and expected delay penalty. As part of the solution we determine optimal safety buffers. We allow for activities that are statistically dependent because they share an error element (e.g., when all durations have been estimated by one person, when weather or general economic conditions influence many activities, etc). We show that under plausible conditions the problem is convex and thus it can be solved by standard numerical search procedures. The purpose of the paper is to encourage software development that will include valid stochastic analysis for scheduling and crashing using current estimates and historical performance records.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Project-driven supply chains: integrating safety-stock and crashing decisions for recurrent projects

We study a new class of problems – recurrent projects with random material delays, at the interface between project and supply chain management. Recurrent projects are those similar in schedule and material requirements. We present the model of project-driven supply chain (PDSC) to jointly optimize the safety-stock decisions in material supply chains and the crashing decisions in projects. We p...

متن کامل

Stochastic Economic Balance Principles for Project Planning: Feeding Buffers, Crashing, and Sequencing

A feeding buffer is created by starting a project activity before its latest start time to provide adequate protection against project delay. Assuming linear costs for starting activities earlier and a linear project delay penalty, early optimization models for project buffers addressed simple project network structures and invoked the newsvendor model as an approximation. Recently, it had been...

متن کامل

Integrating Safety-Stock and Crashing Decisions for Recurrent Projects Subject to Random Material Delays

We identify a new class of problems and their common features – the recurrent projects with random material delays. Recurrent projects are those similar in schedule and material requirements. We present the model of project-driven supply chain (PDSC) to jointly optimize safety-stock decisions in the material supply chain and the crashing decisions in the projects. We exemplify the problem, the ...

متن کامل

Pert 21

More than half a century after the debut of CPM and PERT, we still lack a project scheduling system with calibrated and validated distributions and without requiring complex user input. Modern decision support systems (DSS) for project management are more sophisticated and comprehensive than PERT/CPM. Nonetheless, in terms of stochastic analysis, they show insufficient progress. PERT 21 offers ...

متن کامل

A stochastic model for project selection and scheduling problem

Resource limitation in zero time may cause to some profitable projects not to be selected in project selection problem, thus simultaneous project portfolio selection and scheduling problem has received significant attention. In this study, budget, investment costs and earnings are considered to be stochastic. The objectives are maximizing net present values of selected projects and minimizing v...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • IJITPM

دوره 1  شماره 

صفحات  -

تاریخ انتشار 2010