An improved scatter search algorithm for the single machine total weighted tardiness scheduling problem with sequence-dependent setup times

نویسندگان

  • Qingxin Guo
  • Lixin Tang
چکیده

In this paper, a scatter search algorithm with improved component modules is proposed to solve the single machine total weighted tardiness problem with sequence-dependent setup times. For diversification generation module, both random strategy based heuristics and construction heuristic are adopted to generate the diversified population. For improvement module, variable neighborhood search based local searches are embedded into the algorithm to improve the trial solutions and the combined solutions. For reference set update module, the number of edges by which the two solutions differ from each other is counted to measure the diversification value between two solutions. We also propose a new strategy in which the length of the reference set could be adjusted adaptively to balance the computing time and solving ability. In addition, a discrete differential evolution operator is proposed with another two operators constitute the combination module to generate the new trial solutions with the solutions iscrete differential evolution otal weighted tardiness scheduling in the subsets. The proposed algorithm is tested on the 120 benchmark instances from the literature. Computational results indicate that the average relative percentage deviations of the improved algorithm from the ACO AP, DPSO, DDE and GVNS are −5.16%, −3.33%, −1.81% and −0.08%, respectively. Comparing with the state-of-the-art and exact algorithms, the proposed algorithm can obtain 78 optimal solutions out of 120 instances within a reasonable computational time. © 2015 Published by Elsevier B.V.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Minimizing the total tardiness and makespan in an open shop scheduling problem with sequence-dependent setup times

We consider an open shop scheduling problem with setup and processing times separately such that not only the setup times are dependent on the machines, but also they are dependent on the sequence of jobs that should be processed on a machine. A novel bi-objective mathematical programming is designed in order to minimize the total tardiness and the makespan. Among several mult...

متن کامل

A Novel B and B Algorithm for a Unrelated Parallel Machine Scheduling Problem to Minimize the Total Weighted Tardiness

This paper presents a scheduling problem with unrelated parallel machines and sequencedependent setup times that minimizes the total weighted tardiness. A new branch-and-bound (B and B) algorithm is designed incorporating the lower and upper bounding schemes and several dominance properties. The lower and upper bounds are derived through an assignment problem and the composite dispatching rule ...

متن کامل

A fuzzy mixed-integer goal programming model for a parallel machine scheduling problem with sequence-dependent setup times and release dates

This paper presents a new mixed-integer goal programming (MIGP) model for a parallel machine scheduling problem with sequence-dependent setup times and release dates. Two objectives are considered in the model to minimize the total weighted flow time and the total weighted tardiness simultaneously. Due to the com-plexity of the above model and uncertainty involved in real-world scheduling probl...

متن کامل

Pareto-based Multi-criteria Evolutionary Algorithm for Parallel Machines Scheduling Problem with Sequence-dependent Setup Times

This paper addresses an unrelated multi-machine scheduling problem with sequence-dependent setup time, release date and processing set restriction to minimize the sum of weighted earliness/tardiness penalties and the sum of completion times, which is known to be NP-hard. A Mixed Integer Programming (MIP) model is proposed to formulate the considered multi-criteria problem. Also, to solve the mo...

متن کامل

A Multi-Objective Particle Swarm Optimization Algorithm for a Possibilistic Open Shop Problem to Minimize Weighted Mean Tardiness and Weighted Mean Completion Times

We consider an open shop scheduling problem. At first, a bi-objective possibilistic mixed-integer programming formulation is developed. The inherent uncertainty in processing times and due dates as fuzzy parameters, machine-dependent setup times and removal times are the special features of this model. The considered bi-objectives are to minimize the weighted mean tardiness and weighted mean co...

متن کامل

Single-machine scheduling considering carryover sequence-dependent setup time, and earliness and tardiness penalties of production

Production scheduling is one of the very important problems that industry and production are confronted with it. Production scheduling is often planned in the industrial environments while productivity in production can improve significantly the expansion of simultaneous optimization of the scheduling plan. Production scheduling and production are two areas that have attracted much attention in...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Appl. Soft Comput.

دوره 29  شماره 

صفحات  -

تاریخ انتشار 2015