Considering the systems engineering leading indicators to measure projects performance

نویسندگان

  • Li Zheng
  • Li ZHENG
چکیده

To measure projects performance is available a wide range of methods which help project managers to effectively control the project progress and evaluate project results (Atkinson, 1999; Anantatmula, 2015). However remain several critical issues in their application: unbalanced development of KPIs types (Zidane, Johansen and Ekambaram, 2015), limited availability of leading KPIs (Kueng, Andres, and Wettstein, 2001), etc. Conversely, even if systems engineering measurement (SEM) is a more recent discipline, it offers very deep developments, published in several standards and guides (Wilbur, 1995; INCOSE Measurement Working Group, 1998; INCOSE Measurement Working Group, 2010; INCOSE & PSM, 2005; Roedler, et al., 2010). In particular, SEM uses lagging (reactive) measurement and defines methods to promote leading (predictive) measurement which provides insights before a problem arises (INCOSE & PSM, 2005; Roedler, et al., 2010). To improve project success rate, we propose to improve the measurement of projects performance, on which decisions rely in project management. One way is to extend the indicators to measure project performance by indicators used to measure systems engineering performance. This paper thus considers transferring and adapting the good practices in SE performance measurement such as described in SE guides as well as the set of SE leading indicators (SELIs) defined in (Roedler, et al., 2010) to project performance measurement. INTRODUCTION (BARC, 2009) is a global survey that explores the key challenges faced by organizations today and it is pointed that these challenges make performance management become a key enabler. In fact, since the early 1980s, performance management in general has been widely developed for adapting enterprises into complex business environment through introducing non-financial indicators. Some typical and classic PMSs have been proposed between 1980s and the 1990s, like the Performance Pyramid System (Lynch and Cross 1991) or the Balanced Scorecard (Kaplan and Norton 1992, 1996). Since, the family of PMSs grew with experts from different disciplines having brought fresh blood in the domain by blending the methods of system dynamic, total quality management, supply chain management and so on into the traditional PMSs. As one related diversification, the measurement of projects performance (MPP) has been receiving wide focus from both academy and practitioners (Lauras, Marques and Gourc, 2010; Zheng, et al., 2016). Focus has been diversified in many domains and some remarking results have been gotten, such as earned value project management (Anbari, 2003; Lipke, et al., 2009), performance measurement of engineering projects (Shi., et al., 2015; Guo and Yiu, 2015), benchmarking project performance management (Barber, 2014; Kim and Huynh, 2008 ), et al. Even through the research results have great contributions to the economic development and enterprise competitions, but it seems that all the prior MPP research has proposed a wide variety of KPIs or measures that evaluate the outcomes of a project based on the traditional “iron triangle”: “cost, time and quality” (Atkinson, 1999; Zidane, Johansen and Ekambaram, 2015). Some research provided a set of KPIs that can monitor and control project progress in time and set alarms whenever deviations of project

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Systems engineering leading indicators for assessing program and technical effectiveness

This paper discusses a three year initiative to transform classical systems engineering (SE) measures into leading indicators, including the resulting guidance information that has been developed and future research directions. Systems engineering leading indicators are measures for evaluating the effectiveness of the systems engineering activities on a program in a manner that provides informa...

متن کامل

Multi-criteria approach to project portfolio selection considering structural hardness and correlations between projects

Project portfolio selection is very important subject of decision-makers in project-based organizations. The best assignment of resources to the most appropriate projects is necessary as financing projects with low benefit is just waste of organization's resources. However, existing project selection models pay not much attention the structure and special features of projects as a selection cri...

متن کامل

Comparative analysis of design/build and design/bid/build project delivery systems in Lebanon

Design/bid/build and design/build are two principal project delivery systems used worldwide. The performance of each project may differ with the type of procurement system used. This study has two aims: firstly, to assess and compare the performance of design/bid/build and design/build projects in Lebanon; secondly, to compare the results with the performance of equivalent systems in the Far Ea...

متن کامل

Considering the systems engineering leading indicators to improve project performance measurement

With a long history in project management practices, project performance measurement (PPM) offers a wide range of methods and good practices which help project managers to effectively monitor the project and evaluate project progress and results. However, several critical issues remain, such as an unbalanced development of KPIs types or a limited availability of leading Key Performance Indicato...

متن کامل

Performance Appraisal of Research and Development Projects Value-Chain for Complex Products and Systems: The Fuzzy Three-Stage DEA Approach

The purpose of the current research is to provide a performance appraisal system capable of considering the value chain network structure of research and development (R&D) projects for Complex products and systems (CoPS) under uncertainty of data. Therefore, in order to achieve this goal, a network data envelopment analysis (NDEA) approach and the possibilistic programming to provide a new fuzz...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2017