A Genetic Algorithm Based Railway Scheduling Model

نویسندگان

  • G. Nirmala
  • D. Ramprasad
چکیده

In this paper we present an optimization model for train scheduling. This model constitutes one of the three major components of a solution approach for solving the transit network design problem. The problem of scheduling can be defined in the following general terms. Given the origin destination matrix for the train trips for design period, the underlying train network characterized by the overlapping routes. How optimally to allocate the trains among these routes? The train scheduling problem is solved in two levels. In the first level minimum frequency of trains required on each route. With the guarantee of load feasibility, is determined by considering each route individually. In the second level, the fleet size of first level is taken as upper bound and fleet size is again minimized by considering all routes together and using GAs. The model is applied to a real network, and results are presented.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A New ILP Model for Identical Parallel-Machine Scheduling with Family Setup Times Minimizing the Total Weighted Flow Time by a Genetic Algorithm

This paper presents a novel, integer-linear programming (ILP) model for an identical parallel-machine scheduling problem with family setup times that minimizes the total weighted flow time (TWFT). Some researchers have addressed parallel-machine scheduling problems in the literature over the last three decades. However, the existing studies have been limited to the research of independent jobs,...

متن کامل

A discrete-event optimization framework for mixed-speed train timetabling problem

Railway scheduling is a complex task of rail operators that involves the generation of a conflict-free train timetable. This paper presents a discrete-event simulation-based optimization approach for solving the train timetabling problem to minimize total weighted unplanned stop time in a hybrid single and double track railway networks. The designed simulation model is used as a platform for ge...

متن کامل

A Comprehensive Approach for Railway Crew Scheduling Problem (Case Study: Iranian Railway Network)

The aim of this study is to propose a comprehensive approach for handling the crew scheduling problem in the railway systems. In this approach, the information of different railway trips are considered as input and the problem is divided to three separated phases. In phase I, we generate all feasible sequences of the trips, which are named as the pairings. A depth-first search algorithm is deve...

متن کامل

Train Scheduling Problem with Consideration of Praying Constraint as an Application of Job Shop Scheduling Problem

The present paper extends the idea of job shop scheduling problem with resting constraints to the train scheduling problem with the Muslim praying considerations. For this purpose, after proposing the new mathematical model, a heuristic algorithm based on the Electromagnetism-Like algorithm (EM) which is well adjusted to scheduling problems is employed to solve the large-size practical cases. T...

متن کامل

A novel mathematical model for a hybrid flow shop scheduling problem under buffer and resource limitations-A case study

Scheduling problems play a big role in manufacturing and planning the production for increasing the production efficiency and assigning the resources to operations. Furthermore, in many manufacturing systems there is a physical space between stages that called intermediate buffers. In this study, a model is proposed for minimizing the makespan of a hybrid flow shop scheduling problem with inter...

متن کامل

Fuzzy Programming for Parallel Machines Scheduling: Minimizing Weighted Tardiness/Earliness and Flow Time through Genetic Algorithm

Appropriate scheduling and sequencing of tasks on machines is one of the basic and significant problems that a shop or a factory manager encounters; this is why in recent decades extensive studies have been done on scheduling issues. One type of scheduling problems is just-in-time (JIT) scheduling and in this area, motivated by JIT manufacturing, this study investigates a mathematical model for...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2014