Support for Creating Robust Plans and Schedules
نویسنده
چکیده
Creation of plans and schedules for systems with random phenomena is a research area that is gaining considerable attention. Standard techniques of scheduling and exact methods cannot be utilised for stochastic systems. The measure of robustness is an important indicator of the schedule, representing the resistance of the schedule to random phenomena that occur during the execution of the schedule. This thesis describes the procedure for evaluating the robustness of the schedules. A complete methodology for creating of robust schedules, based on the use of computer simulation, is presented. Three distinct procedures for increasing the robustness (by changing a plan, increasing of time reserves and by changing the order of allocation of resources) are explained in detail. A new method for changing the order of resource allocation to the activities has been developed. Proposed method provides the possibility to identify the order of allocation that will lead to a system deadlock. The procedures were tested using simulation model of an existing container terminal.
منابع مشابه
Developing Robust Project Scheduling Methods for Uncertain Parameters
A common problem arising in project management is the fact that the baseline schedule is often disrupted during the project execution because of uncertain parameters. As a result, project managers are often unable to meet the deadline time of the milestones. Robust project scheduling is an effective approach in case of uncertainty. Upon adopting this approach, schedules are protected against po...
متن کاملA New Approach Generating Robust and Stable Schedules in m-Machine Flow Shop Scheduling Problems: A Case Study
This paper considers a scheduling problem with uncertain processing times and machine breakdowns in industriall/office workplaces and solves it via a novel robust optimization method. In the traditional robust optimization, the solution robustness is maintained only for a specific set of scenarios, which may worsen the situation for new scenarios. Thus, a two-stage predictive algorithm is prop...
متن کاملDosimetric comparison of treatment of left breast cancer using two different dose schedules Dosimetric comparison of treatment of left breast cancer using two different dose schedules
Background: To date, different kinds of treatment methods have been proposed for radiotherapy of cancer patients. Choosing the kind of treatment method affects the quality of the patient's treatment. This study aims to investigate the effect of the number of radiation treatment sessions on the dose received by the patient and the distribution of tumor dose and dose received by organs at risk in...
متن کاملModels of Robustness for Temporal Planning and Scheduling with Dynamic Controllability
Temporal uncertainty is a basic feature in many real scheduling and planning problems. How to achieve a robust schedule or plan which can deal with the temporal uncertainty is a useful issue in real problems. Current research on this issue has introduced different robustness measures. Although they all reflect the quality of temporal schedules or plans in different perspectives, the lack of res...
متن کاملRobust supply chain coordination modeling: A revenue management perspective
The revenue management concept and techniques are applied to model the coordination of supply chain elements. The fundamental premise of this approach is synchronization of a group of business entities consist-ing of a manufacturer and multiple suppliers to achieve an optimal supply chain capacity plans. The output of the supply chain can be various products and thus it is measured in terms of ...
متن کامل