No-Wait Flowshop Scheduling Is as Hard as Asymmetric Traveling Salesman Problem

نویسندگان

  • Marcin Mucha
  • Maxim Sviridenko
چکیده

In this paper we study the classical no-wait flowshop scheduling problem with makespan objective (F |no−wait|Cmax in the standard three-field notation). This problem is well-known to be a special case of the asymmetric traveling salesman problem (ATSP) and as such has an approximation algorithm with logarithmic performance guarantee. In this work we show a reverse connection, we show that any polynomial time α-approximation algorithm for the no-wait flowshop scheduling problem with makespan objective implies the existence of a polynomialtime α(1 + ε)-approximation algorithm for the ATSP, for any ε > 0. This in turn implies that all non-approximability results for the ATSP (current or future) will carry over to its special case. In particular, it follows that no-wait flowshop problem is APX-hard, which is the first non-approximability result for this problem.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Lot Streaming in No-wait Multi Product Flowshop Considering Sequence Dependent Setup Times and Position Based Learning Factors

This paper considers a no-wait multi product flowshop scheduling problem with sequence dependent setup times. Lot streaming divide the lots of products into portions called sublots in order to reduce the lead times and work-in-process, and increase the machine utilization rates. The objective is to minimize the makespan. To clarify the system, mathematical model of the problem is presented. Sin...

متن کامل

On Eulerian Extension Problems and their Application to Sequencing Problems

We introduce a new technique for solving several sequencing problems. We consider Gilmore and Gomory’s variant of the Traveling Salesman Problem and two variants of no-wait flowshop scheduling, the classical makespan minimization problem and a new problem arising in the multistage production process in steel manufacturing. Our technique is based on an intuitive interpretation of sequencing prob...

متن کامل

The Directed Minimum Latency Problem

We study the directed minimum latency problem: given an n-vertex asymmetric metric (V, d) with a root vertex r ∈ V , find a spanning path originating at r that minimizes the sum of latencies at all vertices (the latency of any vertex v ∈ V is the distance from r to v along the path). This problem has been well-studied on symmetric metrics, and the best known approximation guarantee is 3.59 [3]....

متن کامل

Solving Re-entrant No-wait Flexible Flowshop Scheduling Problem; Using the Bottleneck-based Heuristic and Genetic Algorithm

In this paper, we study the re-entrant no-wait flexible flowshop scheduling problem with makespan minimization objective and then consider two parallel machines for each stage. The main characteristic of a re-entrant environment is that at least one job is likely to visit certain stages more than once during the process. The no-wait property describes a situation in which every job has its own ...

متن کامل

Solving Re-entrant No-wait Flow Shop Scheduling Problem

In this study, we consider the production environment of no-wait reentrant flow shop with the objective of minimizing makespan of the jobs. In a reentrant flow shop, at least one job should visit at least one of the machines more than once. In a no-wait flowshop scheduling problem, when the process of a specific job begins on the first machine, it should constantly be processed without waiting ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2013