Past, Present, and Hypothetical Methods for Crane Reintroduction and Migration
نویسنده
چکیده
In the early 1980’s the technique of releasing yearling parent-reared cranes was perfected with the Mississippi sandhill crane (Grus canadensis pulla). In the late 1980’s, we discovered that hand-reared yearlings could also be released with good expectation of survival in both migratory and nonmigratory situations. In the mid-1990’s, efforts expanded in many directions including (1) the use of various types of motorized vehicles to lead migrations, (2) the release of juveniles one by one into wild flocks in autumn or winter, and (3) the release of adult pairs. Here I outline new and proven techniques and those likely important in future reintroduction and migration projects. PROCEEDINGS NORTH AMERICAN CRANE WORKSHOP 9:197-202
منابع مشابه
Reintroduction Project Habitat Regulations in Sweet Home Saving Room for Ocelots Howler Monkeys' Ability to in Southern Texas Cope with Habitat Fragmentation A Whooping Crane Reintroduction Project on the Canadian Prairies: Identifying Relevant Issues Using Expert Consultation
متن کامل
A new multi-objective model for berth allocation and quay crane assignment problem with speed optimization and air emission considerations (A case study of Rajaee Port in Iran)
Over the past two decades, maritime transportation and container traffic worldwide has experienced rapid and continuous growth. With the increase in maritime transportation volume, the issue of greenhouse gas (GHG) emission has become one of the new concerns for port managers. Port managers and government agencies for sustainable development of maritime transportation considered "green ports" t...
متن کاملYard crane scheduling in port container terminals using genetic algorithm
Yard crane is an important resource in container terminals. Efficient utilization of the yard crane significantly improves the productivity and the profitability of the container terminal. This paper presents a mixed integer programming model for the yard crane scheduling problem with non- interference constraint that is NPHARD in nature. In other words, one of the most important constraints in...
متن کاملA Mathematical Model and Grouping Imperialist Competitive Algorithm for Integrated Quay Crane and Yard Truck Scheduling Problem with Non-crossing Constraint
In this research, an integrated approach is presented to simultaneously solve quay crane scheduling and yard truck scheduling problems. A mathematical model was proposed considering the main real-world assumptions such as quay crane non-crossing, precedence constraints and variable berthing times for vessels with the aim of minimizing vessels completion time. Based on the numerical results, thi...
متن کاملYard Crane Pools and Optimum Layouts for Storage Yards of Container Terminals
As more and more container terminals open up all over the world, competition for business is becoming very intense for container terminal operators. They are finding out that even to keep their existing Sea Line customers, they have to make them happy by offering higher quality service. The quality of service they can provide depends on their operating policies and the design of the terminal la...
متن کامل