Infinite Horizon Production Scheduling in Time - Varying Systems Under Stochastic Demand

نویسندگان

  • Torpong Cheevaprawatdomrong
  • Robert L. Smith
چکیده

We consider infinite horizon production scheduling under stochastic demand. All problem data are allowed to vary across periods, including demand distributions, costs, and revenues. A forecast horizon, when it exists, is a finite problem horizon with the property that the corresponding first-period optimal production decision remains optimal regardless of demand and cost projections beyond this horizon. Thus, a forecast horizon allows us to reduce the amount of future data we need to forecast to solve for an optimal first decision for the infinite horizon problem. In this paper, we establish the existence of a forecast horizon under the assumptions that (1) costs and revenues are time-varying linear, and (2) demand is never eventually zero. A key result for establishing the existence and computation of forecast horizons is the monotonicity, and hence convergence, of optimal first-period policies as the horizon increases of finite horizon versions of the infinite horizon problem. A closed-form formula is provided for computing a forecast horizon that depends only on the discount factor and uniform upper and lower bounds on demand and unit production and inventory holding costs. In particular, its value is independent of, and determined in advance of, forecasting the demand distribution. We show that the effect of uncertainty in demand is to increase the forecast horizon associated with a deterministic problem by a constant plus a factor equal to one plus the ratio of these upper to lower bounds on per-period demand. The associated forecast horizon can be surprisingly short, even a few days, when the inventory costs are high.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Stochastic Inventory Models with Limited Production Capacity and Periodically Varying Parameters

We consider a single-item, periodic-review inventory model with uncertain demands in which each period's production volume is limited by a capacity level. The demand distributions, capacity levels, and cost parameters vary according to a periodic pattern. We prove that modified base-stock policies are optimal for the finite-horizon planning model and for both the infinite-horizon discounted and...

متن کامل

Simultaneous Lot Sizing and Scheduling in a Flexible Flow Line

This paper breaks new ground by modelling lot sizing and scheduling in a flexible flow line (FFL) simultaneously instead of separately. This problem, called the ‘General Lot sizing and Scheduling Problem in a Flexible Flow Line’ (GLSP-FFL), optimizes the lot sizing and scheduling of multiple products at multiple stages, each stage having multiple machines in parallel. The objective is to satisf...

متن کامل

Infinite Horizon Production Planning in Time-varying Systems with Convex Production and Inventory Costs

We consider the planning of production over the infinite horizon in a system with timevarying convex production and inventory holding costs. This production lot size problem is frequently faced in industry where a forecast of future demand must be made and production is to be scheduled based on the forecast. Because forecasts of the future are costly and difficult to validate, a firm would like...

متن کامل

Forecast Horizons for Production Planning with Stochastic Demand

Forecast horizons, i.e long enough planning horizons that ensure agreement of first period optimal production decisions of finite and infinite horizon problems regardless of changes in future demand, are shown to exist in the context of production planning under stochastic demand. The monotonicity of first period optimal production decisions with respect to first order stochastic shifts in dema...

متن کامل

A Hierarchical Production Planning and Finite Scheduling Framework for Part Families in Flexible Job-shop (with a case study)

Tendency to optimization in last decades has resulted in creating multi-product manufacturing systems. Production planning in such systems is difficult, because optimal production volume that is calculated must be consistent with limitation of production system. Hence, integration has been proposed to decide about these problems concurrently. Main problem in integration is how we can relate pro...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Operations Research

دوره 52  شماره 

صفحات  -

تاریخ انتشار 2004