Definition and Validation of Requirement Management Measures - PhD Project Plan

نویسنده

  • Annabella Loconsole
چکیده

The goal of this research is to define and validate (theoretically and empirically) requirements management measures connected to the attributes stability and volatility of requirements. With theoretical validation we prove that the relationships between the entities in the empirical world are still valid in the mathematical/formal world. With empirical validation we prove that a measure is a predictor of some attribute.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Evaluation of Aqua Crop Computer Model in the Potato Under Irrigation Management of Continuity Plan of Jiroft Region, Kerman, Iran

The agricultural regions are running into difficulties, which are restrictive availability of water, successive appearing draughts, and overuse of ground water resources for supplemental water requirements. As a sample which is got from the farm is sent to the laboratory for testing and the laboratory works need devices. Hence, conducting farm experiments are expensive and time consuming to opt...

متن کامل

Evaluation of Aqua Crop Computer Model in the Potato Under Irrigation Management of Continuity Plan of Jiroft Region, Kerman, Iran

The agricultural regions are running into difficulties, which are restrictive availability of water, successive appearing draughts, and overuse of ground water resources for supplemental water requirements. As a sample which is got from the farm is sent to the laboratory for testing and the laboratory works need devices. Hence, conducting farm experiments are expensive and time consuming to opt...

متن کامل

Definition and Validation of Requirements Volatility Measures

This paper is a summary of a PhD thesis which describes our effort to define and validate requirements volatility measures. These measures have been proven to be reliable predictors of requirements volatility. 1. TECHNICAL PROBLEM Since requirements often change, even during development, it is important to predict the continuing definition of requirements as they change throughout the software ...

متن کامل

Development and Validation of Active Performance Indicators of Electrical Safety Using Bow-Tie and Bayesian Network Techniques Case Study: Oil and Gas Industries Construction Projects

Background: With the developing use of electricity in all aspects of human life, electricity accidents have also increased. One of the main components of the for the prevention policy, is the safety performance assessment of the organization's or industry's by using appropriate performance indicators with related operations.   Method: This study was a descriptive-analytical of 6 steps inc...

متن کامل

Identifying the barriers and challenges for the implementation of the Shahab plan in elementary schools

Purpose: The project of identifying and leading gifted students (Shahab) was implemented between 2014 and 2015 Education Year by the National Elites Foundation in cooperation with Education Ministry in some regions of all provinces of Iran. Methodology: The project’s main goal was to identify, distinguish and guide the gifted students in elementary and junior education and paving the way to sup...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2005