Mine / Mill production planning based on a Geometallurgical Model Mining Mineração
نویسندگان
چکیده
The Pau Branco mine supplies two blast furnaces with iron ore lumps, and currently, charcoal consumption for pig iron production accounts for 47% of the blast furnaces’ operational cost. A geometallurgical model is presented to support an economic study considering reserve volumes, product quality, and operational costs based on the metallurgical performance of different iron ore typologies. Sample analysis provides values required in the model. From the model, an alternative production plan is presented with a positive impact of USD 25.6M over the current net present value of the mining/mill system.
منابع مشابه
Resilient Decision Making in Open Pit Short-term Production Planning in Presence of Geologic Uncertainty
Short-term production plans are the basis for operational mine production schedules. They concentrate on making long-term mine plans operationally feasible. Furthermore, some variables such as ore grade and tonnage govern mine production systems and cause uncertainty in the supply of raw materials to the mills. Due to the quality variation of material, short-term production optimization is an u...
متن کاملDevelopment of Geometallurgical Indices for Semi-Autogenous Grinding at Sarcheshmeh Porphyry Copper Mine
Geometallurgy tries to predict the instability the behavior of ores caused by variability in the geological settings, and to optimize the mineral value chain. Understanding the ore variability and subsequently the process response are considered to be the most important functions of an accurate geometallurgical study. In this paper, the geometallurgical index is presented as a new tool to...
متن کاملGeometallurgical Mapping: a New Approach That Reduces Technical Risk
Geometallurgical mapping is a new team-based approach that documents variability within an orebody and quantifies the impact of geology (host rocks, alteration and structure) and mineralogy on grinding, metallurgical response and metal recovery processes. The quantitative, spatially constrained database that results can be readily integrated into 3-D block models and mine planning activities. T...
متن کاملCommodity price uncertainty propagation in open-pit mine production planning by Latin hypercube sampling method
Production planning of an open-pit mine is a procedure during which the rock blocks are assigned to different production periods in a way that leads to the highest net present value (NPV) subject to some operational and technical constraints. This process becomes much more complicated by incorporation of the uncertainty existing in the input parameters. The commodity price uncertainty is among ...
متن کاملRobust production scheduling in open-pit mining under uncertainty: a box counterpart approach
Open-Pit Production Scheduling (OPPS) problem focuses on determining a block sequencing and scheduling to maximize Net Present Value (NPV) of the venture under constraints. The scheduling model is critically sensitive to the economic value volatility of block, block weight, and operational capacity. In order to deal with the OPPS uncertainties, various approaches can be recommended. Robust opti...