In mining projects, the design and production programmes are developed on the basis of a block model. This model requires defining, assessing and assuring many important parameters used in the feasibility study and that may have relevant consequences over the future results of the project. The selection of such parameters is a complex engineering decision due to their great economic impact on the mining operation, as they will significantly affect the mine design and planning. For example, concerning the block model, there are many decisions involving the grades of the elements of interest, by-products and impurities, the dilution percentage, the selectivity and the rock density. A fundamental parameter of this model is the choice of the block dimensions, since this will condition mining dilution and selectivity, affecting the operation and mining costs. The objective of this study is to quantify the influence of the block size on the mining selectivity and its impact over the projects final economic results (income, costs, and discounted cash flows), a topic that has not been systematically studied in the literature so far.
منابع مشابه
A Hybrid Fuzzy MCDM Approach to Determine an Optimal Block Size in Open-Pit Mine Modeling: a Case Study
The computer-based 3D modeling of ore bodies is one of the most important steps in the resource estimation, grade determination, and production scheduling of open-pit mines. In the modeling phase, the volume of the orebody model is required to be filled by the blocks and sub-blocks. The determination of Block Size (BS) is important due to the dependence of the geostatistical issues and calculat...
متن کاملUse of a mixed integer programming model to achieve an optimum size of blast block in open-pit mining with regard to size of mineable block using fuzzy logic approach
In this paper, we present an integrated model to find the optimum size of blast block that uses (i) a multi-criteria decision-making method to specify the applicable size of the mineable block; (ii) a linear programming method for the selection of the blasted areas to be excavated and in deciding the quantity of ores and wastes to be mined from each one of the selected blocks. These two methods...
متن کاملCommodity price uncertainty propagation in open-pit mine production planning by Latin hypercube sampling method
Production planning of an open-pit mine is a procedure during which the rock blocks are assigned to different production periods in a way that leads to the highest net present value (NPV) subject to some operational and technical constraints. This process becomes much more complicated by incorporation of the uncertainty existing in the input parameters. The commodity price uncertainty is among ...
متن کاملRobust production scheduling in open-pit mining under uncertainty: a box counterpart approach
Open-Pit Production Scheduling (OPPS) problem focuses on determining a block sequencing and scheduling to maximize Net Present Value (NPV) of the venture under constraints. The scheduling model is critically sensitive to the economic value volatility of block, block weight, and operational capacity. In order to deal with the OPPS uncertainties, various approaches can be recommended. Robust opti...
متن کاملDetermination of Ultimate Pit Limits in Open Mines Using Real Option Approach
Planning and design procedure of an open pit mining project just can be started after ultimate pit determination. In the carried out study in this paper it was shown that the most important factor in ultimate pit determination and in consequence in the whole planning and design procedure of an open pit mine is the metal price. Metal price fluctuations in recent years were exaggerated and impose...