The study of applying ANP model to assess dispatching rules for wafer fabrication
نویسندگان
چکیده
Wafer fabrication is a capital-intensive high-tech sector with highly complex manufacturing processes. Therefore, most of the fabs resort to production dispatching as a means to enhancing production efficiency. The commonly seen methods of production dispatching at the present time are devised to meet single performance indicators. Few methods take into account multiple, or even conflicting performance indicators. Therefore, different production control managers adopt different criteria. Also, as performance indicators change with the variances of production lines and actual demands, it is necessary to clarify the rules of varying dispatching methods and their impacts on all the production performance indicators so that it is possible to explore an architecture for multiple-rule or multiple-target production dispatching in order to meet dynamic performance targets. This paper uses analytical network process (ANP) method to construct a dispatching model based on the characteristics of all the production facilities on-site (such as the utilization of bottleneck machines), in order to explore the relationship among various performance indicators and correlation between performance indicators and the dispatching rules. The aim of this paper is to analyze the production dispatching issues of wafer fabs in an effective and systematic approach, so as to provide an on-site dispatching analysis model that takes into consideration production characteristics and indicator adjustments. This paper finds that the most optimal dispatching method for ANP dispatch model is EDD dispatching method, followed by LS dispatching method. FIFO dispatching method yields the worst performance. The ANP dispatching assess model proposed in this paper can surely serves as an analytical architecture for decision makes to evaluate production dispatching models of multiple production indicators in the future. 2007 Elsevier Ltd. All rights reserved.
منابع مشابه
Due-Date Based Scheduling and Control Policies in a Multiproduct Semiconductor Wafer Fabrication Facility
This paper focuses on lot release control and scheduling problems in a semiconductor wafer fab producing multiple products that have different due dates and different process flows. For lot release control, it is necessary to determine the type of a wafer lot and the time to release wafers into the wafer fab, while it is necessary to determine sequences of processing waiting lots in front of wo...
متن کاملDue-date performance improvement using TOC's aggregated time buffer method at a wafer fabrication factory
Due-date performance is one of the most important production indexes for success utilized by wafer fabrication factories. Traditionally, the industry sets a specific due-date tightness level and a dispatching rule based on the total processing time, the production capacity, pre-defined order release criteria and historical data, to ensure deliveries are made on-time. However, such policies typi...
متن کاملComparison of Dispatching Rules for Semicondutor Manufacturing Using Large Facility Models
In this paper, we present a comparison of five dispatching rules that aim to reduce the mean and the variance of cycle times. The performance of the dispatch rules is evaluated using simulation results for two large semiconductor wafer fabrication facilities. The results show that which dispatch rule achieves the best results depends on the fab, on the load of the fab and on the product.
متن کاملDynamic Scheduling Rule Selection for Semiconductor Wafer Fabrication
In this paper, we exploit the speed of an ordinal optimization (OO)-based simulation tool designed by Hsieh et al. to investigate dynamic selection of scheduling rules for semiconductor wafer fabrication (fab). Although a scheduling rule is a combination of loading wafer release and dispatching rules, this paper specifically focuses on dispatching when significant amount of wafers-in-process (W...
متن کاملNew scheduling rules for a dynamic flexible flow line problem with sequence-dependent setup times
In the literature, the application of multi-objective dynamic scheduling problem and simple priority rules are widely studied. Although these rules are not efficient enough due to simplicity and lack of general insight, composite dispatching rules have a very suitable performance because they result from experiments. In this paper, a dynamic flexible flow line problem with sequence-dependent se...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Expert Syst. Appl.
دوره 34 شماره
صفحات -
تاریخ انتشار 2008