Late work minimization in a small flexible manufacturing system

نویسنده

  • Malgorzata Sterna
چکیده

The paper concerns a small flexible manufacturing system consisting of three CNC machines: a lathe machine, milling machine and measurement center and a single robot, located at the Poznań University of Technology. A short description of the production environment, which can be modeled as the extended job shop system with open shop sections within particular jobs, is followed by the proposition of a branch and bound method. It optimizes production plans within a single shift in order to minimize the late work, i.e. the amount of work executed after a given due date. Based on results of computational experiments, conclusions are formulated on the efficiency of the B&B algorithm and on the behavior of FMS under consideration. 2006 Elsevier Ltd. All rights reserved.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A hybrid algorithm optimization approach for machine loading problem in flexible manufacturing system

The production planning problem of flexible manufacturing system (FMS) concerns with decisions that have to be made before an FMS begins to produce parts according to a given production plan during an upcoming planning horizon. The main aspect of production planning deals with machine loading problem in which selection of a subset of jobs to be manufactured and assignment of their operations to...

متن کامل

A fixed and flexible maintenance operations planning optimization in a parallel batch machines manufacturing system

Scheduling has become an attractive area for artificial intelligence researchers. On other hand, in today's real-world manufacturing systems, the importance of an efficient maintenance schedule program cannot be ignored because it plays an important role in the success of manufacturing facilities. A maintenance program may be considered as the heath care of manufacturing machines and equipments...

متن کامل

Solving Re-entrant No-wait Flexible Flowshop Scheduling Problem; Using the Bottleneck-based Heuristic and Genetic Algorithm

In this paper, we study the re-entrant no-wait flexible flowshop scheduling problem with makespan minimization objective and then consider two parallel machines for each stage. The main characteristic of a re-entrant environment is that at least one job is likely to visit certain stages more than once during the process. The no-wait property describes a situation in which every job has its own ...

متن کامل

Optimizing Flexible Manufacturing System: A Developed Computer Simulation Model

In recent years, flexible manufacturing system as a response to market demands has been proposed to increase product diversity, optimum utilization of machines andperiods of short-term products.The development of computer systems has provided the ability to build machines with high functionality and the necessary flexibility to perform various operations. However, due to the complexity and the ...

متن کامل

Mathematical Modeling for a Flexible Manufacturing Scheduling Problem in an Intelligent Transportation System

This paper presents a new mathematical model for a production system through a scheduling problem considering a material handling system as an intelligent transportation system by automated guided vehicles (AGVs). The traditional systems cannot respond to the changes and customer’s demands and for this reason, a flexible production system is used. Therefore, for this purpose, automated transpor...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Computers & Industrial Engineering

دوره 52  شماره 

صفحات  -

تاریخ انتشار 2007