A Work Breakdown Structure that Integrates Different Views in Aircraft Modification Projects

نویسندگان

  • J. M. García-Fornieles
  • Ip-Shing Fan
  • A. Perez
  • C. Wainwright
  • Kamal Sehdev
چکیده

The Work Breakdown Structure (WBS) defines the work scope of a project. The way a WBS is defined depends on the person and his/her viewpoint. The aircraft modification business carries out a great variety of projects. Although the core skills and tasks are similar, there are very few projects that are exact repetition of previous work. The reuse of information is difficult without a good structure to archive and manage project information. This paper presents an integrated WBS approach for managing the work scope in aircraft modification projects. The model is the result of an in-depth study and analysis of the working methods in an aircraft modification industrial company. This WBS is designed to incorporate the information needs and the views of the different functions involved in aircraft modification. It provides the structure for the reuse of information, such as cost and schedules, in the diverse range of aircraft modification projects. In this model, the top tiers of the WBS are configured from a pre-defined industry specific template. The lower tiers are defined with a flexible structure to support the different views of the knowledge users and providers in the project. The information need for all the life stages of the project is fully covered. The integrated WBS is being implemented in an enterprise wide computing solution that is used for cost estimating in the collaborating company. The same approach could be used to enhance knowledge reuse where there is a great diversity in project contracts.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Model-Based Approach for Planning Work Breakdown Structures of Complex Systems Projects

Planning the development efforts within large-scale projects is a highly complicated mission due to uncertainties regarding different aspects of the complex product to be delivered. Current planning practices employ a host of methods, including Work Breakdown Structure (WBS). Using WBS, the deliverable—the end product to be delivered, its components, and associated enabling products—are mostly ...

متن کامل

An optimal model for Project Risk Response Portfolio Selection (P2RPS) (Case study: Research institute of petroleum industry)

In the real world, risk and uncertainty are two natural properties in the implementation of Mega projects. Most projects fail to achieve the pre-determined objectives due to uncertainty. A linear integer programming optimization model was used in this work to solve a problem in order to choose the most appropriate risk responses for the project risks. A mathematical model, in which work structu...

متن کامل

Effect of soil structure breakdown on splash erosion in different soil textures

This study was carried out to investigate the role of soil structure in splash erosion in semi-arid soils. Splash erosion was measured in four soil textures (silty clay loam, sandy clay loam, silt loam and sandy loam) with two soil structure conditions (with natural structure and under aggregate breakdown) using a simulated rainfall with 50 mmh-1 in intensity for 30 min in splash caps with 10-c...

متن کامل

Robust MRAC for a Wing Rock Phenomenon in Delta Wing Aircrafts

Wing rock phenomenon is an undesired motion appears in high angles of attack where a rolling in the aircraft in positive and negative roll angles with specified amplitude and frequency is occurred. In this paper two adaptive controllers suggested to control the rolling dynamics under wing rock phenomenon for a delta wing aircraft with presence of disturbance. Disturbance was considered as unmat...

متن کامل

Work breakdown structure (WBS) development for underground construction

a r t i c l e i n f o A work breakdown structure (WBS) can prove to be pivotal to successful project management planning. There are few published studies about the methodologies or tools to develop the appropriate WBS for a project, and those that are available are limited to the specific areas of construction such as apartment-building construction and boiler manufacturing. This research has a...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Concurrent Engineering: R&A

دوره 11  شماره 

صفحات  -

تاریخ انتشار 2003