A royalty negotiation model for BOT (build-operate-transfer) projects: The operational revenue-based model

نویسندگان

  • Chao-Chung Kang
  • Cheng-Min Feng
  • Chiu-Yen Kuo
چکیده

Whilst few studies have explored royalty negotiations for build, operate and transfer (BOT) projects, some works have proposed numerous royalty formulas to evaluate royalty amounts or franchise fees for a BOT project. Despite this, the royalty negotiation process is one of the many critical negotiation items of a concession contract. This study not only developed a royalty negotiation model for BOT projects, but also developed the iterative algorithm for the BLP problem for the government and the private sector. In addition, the factors incorporated into the iterative algorithm for the BLP problem include the concession rate, learning rate, and the time value discount rate for both parties. Moreover, this paper conducted a case study of the Taipei Port Container Logistic BOT Project using LINGO and MATLAB programming. The results show that the two parties involved completed royalty negotiation at the sixth negotiation. The objective function value for lower-level programmingwas 1.062 and the government finance recovery rate for higher-level programmingwas 11.832. The findings show that the government can receive the royalty,which is calculated byusing 0.012%of the operating revenue of this BOTproject, from the concessionaire. Therefore, the royalty negotiation model based on the operating revenue developed herein; could be employed to explain the negotiation behavior. © 2011 Elsevier Ltd. All rights reserved.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Determination of Concession Period in Build-Operate-Transfer Projects Using Fuzzy Logic

The build-operate-transfer (BOT) projects are a popular method of privatization of public infrastructure development. There are several risks which might affect a BOT project negatively. Concession period is one of the most important decision variables in arranging a BOT-type contract which should be determined considering the existing risks and uncertainties. A longer concession period is more...

متن کامل

Valuing Simple Multiple-Exercise Real Options in Infrastructure Projects

The revenue risk is considerable in infrastructure project financing arrangements such as build–operate–transfer BOT . A potential mitigation strategy for the revenue risk is a governmental revenue guarantee, where the government secures a minimum amount of revenue for a project. Such a guarantee is: 1 only redeemable at distinct points in time; and 2 more economical if the government limits th...

متن کامل

Modelling and assessment of critical risks in BOT road projects

Over the years, many private sector participation (PSP) models have been evolved for infrastructure procurement and the Build-Operate-Transfer (BOT) model is one of the most common approaches used for the same. Private infrastructure projects under BOT arrangement have a complex risk profile and to a considerable extent, the success of any BOT project is influenced by the degree to which variou...

متن کامل

Investment with Government Subsidies and Cost Contingency : The Case of Build - Operate - Transfer ( BOT ) Toll Road 1

Investment in toll road normally involves a portfolio of real options. We model a portfolio of real options with cost contingency and government subsidy at the operation stage. We demonstrate that the investment value is highly sensitive to cost and revenue uncertainties. Our numerical example suggests that the investment value of risky project is higher when net income guarantee is used instea...

متن کامل

Application of rapid impact assessment matrix and sustainability model in environmental impact assessment and operational optimization of solid waste transfer stations in Tehran

Background and Objective: Municipal waste transfer stations (WTS), operate as middle elements in waste collection and transfer to the final disposal site. Besides their benefits in waste transportation cost reduction, WTS can cause negative environmental impacts such as noise, air, and water pollution. Environmental impact assessment is an effective solution to reduce the environmental impacts ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Mathematical and Computer Modelling

دوره 54  شماره 

صفحات  -

تاریخ انتشار 2011